Clarify the application of services to borders, evidentiary requirements, technical evaluation and resolution pathways
This policy is aimed at providing quality assurance for failure problems caused by material, process or design under normal conditions of transport, installation, commissioning, and operation of large-scale Energy Services.

With the goal of securing, stabilizing and complying with the project, all judgements are based on asset identification, operational status, failure evidence and contractual engagement.
Applicable object: End-users (owners / operators) and authorized parties
Important tip: The policy is generic only and the specific interest is based on the contract and the project agreement.
TIANCHU
SCOPE
Clear boundariesClear definition of the scope of application and the boundary of responsibility
EVD
Evidence-drivenFull evidence as a basis for technical judgement
REV
Professional evaluationMultidisciplinary technical review, individual findings supported
FIX
Efficient resolutionRegularize response processes and reduce downtime
CLOSE
Closed circle managementValidation and archiving, continuous improvement

Coverage and liability boundary

Battery system (Battery module) Cores, Modulars, BMS, Batteries, Conservatories, etc.
Heat management system Air-conditioning / Liquid chiller, wind, pump valve, temperature control
FIRE FIGHTING SYSTEM Gas fire suppression systems, fire alarms and connections
PCS PCS mains, voltage transformers, electrical distribution and protection units
EMS(Energy Management System) EMS controller, software functionality and communication interface
Installation and engineering (our range) Systems Establishment, site installation and agreed scope of work

User / operator liability

  • Transport, installation, commissioning and operation in accordance with product manuals, transport specifications and safety requirements;
  • Provide the necessary operating environment, configuration, logs and maintenance records;
  • (b) Timely submission of complete evidence and cooperation with evaluation as required by this policy;
  • Unauthorized disassembly, inappropriately retrofitting or using equipment beyond design conditions.
⚠

Service processing processFrom problem to closure.

01
Notification of issuesUsers submit questions and failure notifications
02
Submission of evidenceProvide complete evidence and basic information
03
Technical reviewTechnical evaluation and analysis by multidisciplinary teams
04
EligibilityWhether or not it is covered
05
Resolution of implementationDevelop and implement Solutions
06
Authentication and CloseVerify results and close worksheets
i We shall complete the receipt, technical analysis and response as soon as we have received the full evidence; the actual time frame is based on the contractual agreement.

List of evidentiary requirements To expedite the review, please provide as much complete information as possible at once.

PRJ
Project information Project name, site, contract number, equipment serial number, shipping time
PIC
Live Photo / Video Platoon of equipment, overall installation environment, trouble spots.
LOG
Run Data EMS / PCS / BMS log for at least 72 hours before and after the incident
CFG
Configuration and Version System configuration, software version, parameter settings amplifier
ALM
Reports and incidents Alarm records, event timeline, and protection-action records
DOC
Other supporting information Maintenance of records, inspection reports, historical worksheets (if any)

Accountability matrix Example:

Category Typical matters Our responsibility. User / operator liability Third-party liability
Product Body Hardware deficiencies in batteries, PCS, EMS, heat management, fire protection, etc. — —
Design and planning System design issues under our responsibility. — —
Install and Debug We didn't do the installation, debugging. — —
Use and Transport Super-regulated, misdefined, unmaintained — —
External environment Force majeure for natural disasters, external fires, floods, overloads, etc. — —
Third party equipment/ system Problems caused by electricity grids, loads, third-party software or equipment — —
Rehabilitation and dismantling Problems caused by unauthorized modifications, dismantlings, repairs — —
Principal responsibility Partial liability (depending on specific circumstances) - No responsibility.

Eligibility thinking Decision Tree

Problem.
Is it within the Quality Assurance period?
No free Quality Assurance
Launchable services
Is the evidence complete and sufficient?
Is it our cause?
It's not our responsibility.
It's our responsibility.
Entering Resolution Path
Yes. Yes Yes Yes.

Solve Path Possible Solutions

FIX

Maintenance Repair

  • Remote guidance or on-site maintenance;
  • (b) Replacement of malfunctioning devices;
  • After completion, do the Fundal Validation.
REP

Replacement Replacement

  • (b) Replacement of faulty parts or units;
  • (b) Provide alternative programmes where necessary;
  • Update system configuration and validate.
TS

Technical Support Technical Support

  • Parameter optimization and configuration adjustments;
  • Software upgrade and problem restoration;
  • Remote Trading and Technical Advice.

Service commitments (principles)

TIME
Timely responseUpon receipt of complete evidence, respond as soon as possible.
PRO
Professional supportEngineering Team provides Technic Support
TRACE
Transparent communicationProcess transparency and timely feedback on progress
SAFE
Security prioritySecurity first, compliance.
LOOP
Continual ImprovementReassess experience and continuously optimize services

Would you like Technical Support or launch a service request?

Please use the contractual service channel Contact Us, which we will respond to and assist in resolving as soon as possible.