Integrated lithium battery energy storage solutions
MICrogrid PROJECTS | Microgrid Project

It's between the net and the island.
Keep multi-energy in the same control target.

Real physical system x digital sandpad validation x auditable chain of evidence to keep the grid, voltage, energy storage, diesel generators and critical loads clear in normal, disturbed, isolated islands and reconnected.

Project Evidence Module TC-DEMO-PROJ-MG-10128

10.128 MWh / 2.5 MW Microgrid Demonstration Project

BESS System 2.5MW / 10.128MWh
Photovoltaic access PV 1.6MWp
Diesel generators 2.0MW
Public grid access 10kV connection point
Critical load 1.8MW
Microgrid controller Local autonomous operation
Presentation Validation Recoverable experimental chain

01 Physical expansion. PHYSICAL TOPOLOGY

Public electricity grid 10kV / 50Hz 10kV switch station Switchgear Optical Array PV 1.6MWp Microgrid controller Microgrid Controller Diesel generators Gen-set 2.0MW DC Block A 5.064MWh PCS-A 1.25MW DC Block B 5.064MWh PCS-B 1.25MW DCS-A DC / AC Interface DCS-B DC / AC Interface Key Load Master Line Critical Load Bus Non-critical load bus Non-Critical Load Bus

02 Functional structure RESPONSIBILITY ARCHITECTURE

EMS / Energy Management (Planting Level)

Current/ Daily Schedule . Run Policy Optimization . KPI and Report

Microgrid controller (control layer)

Model management Net/Silver/Black Start Power/frequency/voltage control

PCS / BMS (Equipment Layer)

Two-way power control, SOC management and threshold, charge protection.

Protection and monitoring (field level)

• Surveying and collecting Quick Fault Cut

EMS / Energy Management: is responsible for the optimization of current and day-to-day operating plans and operational targets and does not undertake equipment-level rapid protection actions.

03 Status conversion and event time Line The whole chain of events.

Networking

Grid Connected

t0 · 10:00:00.000

Stable grid operation

Disturbing occurred.

Disturbance

t1 · 10:00:01.250

The grid's down.

Safe separation / island

Controlled Separation

t2 · 10:00:01.520

Protective action complete. Microgrid is under control.

Black Start

Black Start

t3 · 10:00:02.120

BESS establishes the main line, activates the generator.

Island stability

Island Stabilization

t4 · 10:00:10.500

Frequency / Pressure restored, key load stable

Reconnect

Resynchronization

t5 · 10:00:40.800

Phase, frequency, and voltage.

Network Restoration

Grid Restored

t6 · 10:00:52.300

Network restoration, system return to normal mode

04 Key Curve SYNCHRONIZED CURVES

Frequency (Hz)

voltage (pu)

BESS Power (MW)

BESS SOC(%)

Diesel output (MW)

Network power (MW)

05 Critical load priority and failure impact boundary

F
Fault impact area Segregation / Restraint
C
Critical load area The island's priority is to maintain the power supply.
N
Non-critical load area Can be removed or recovered late if necessary

06 Local autonomy under communications loss LOCAL AUTONOMY UNDER COMMS LOSS

LOSS
Communication links interrupted. Comms Loss
LOCAL
Local autonomous operation Local Autonomy
TIME
Time Sync PTP / Local Clock
STORE
local cache Store & Forward
EVT
Organisation Event Reconstruction
Local closed-loop control logic
Key strategies implementable
Event data not lost
AutoReturn After Restore

07 Functional validation and acceptance FAT / SAT Evidence

BLACK

Black Start Authentication
Black Start

  • Start without external power
  • Create a power/ frequency baseline
  • Critical load recovery successful.
SAT Outcome: Adopted
SEP

Controlled separation / seamless switching
Controlled Separation

  • Protect and control concerted actions
  • Separation Time 300 ms
  • voltage / frequency deviation meets limit values
SAT Outcome: Adopted
ISL

Stability and recovery of island loads
Island Stabilization

  • Frequency
  • Electricity 0.95 – 1.05 pu
  • Load recovery rate 95%
SAT Outcome: Adopted
GRID

Network Restoration
Grid Restoration

  • Phase difference & lt; 10°
  • Frequency difference & lt; 0.1Hz
  • Network impact controlled.
SAT Outcome: Adopted
FAULT

Fault injection test.
Fault Injection

  • Three-way short.
  • Single-stage failure
  • Pressure drop / Restore
SAT Outcome: Adopted
ACC

Acceptance certificate
Acceptance Criteria

  • Function meets design requirements
  • Protecting logic is right.
  • Incident link auditable
  • Complete documentation and evidence
SAT Conclusion: Adopted

08 Engineering design and delivery ENGINEERING & DELIVERY

SLD Line Chart Project Electrical Pop-up Design
PRO Protection cooperation Set Value & Select
ICD Interface Configuration Electrical / Communications Interface Details
TEST Systems Integration Test FAT / SAT execution
KPI Performance acceptance Certification of key indicators
DOC Document Archive Map / Report / Package

• An island test of evidence Examples

Trigger condition

Trigger

10kV bus voltage drop

Pressure drop & gt; 80%

Protect Actions

Protective Action

Switch release

Microgrid's under control.

Control response

Control Response

BESS Handover Power

Generators are activated.

Stabilization results

Stabilization Result

Frequency 49.98Hz

Electricity 1.00pu

It's a long island.

Island Duration

00:28:31

Steady the island.

Reconnect

Resynchronization

Phase difference 3.2°

Frequency difference 0.03Hz

Conclusion of acceptance

Approval

SAT through

Records Archive

10 Representative validation project: TC-DMO-PROJ-MG-10128

PROJECT OVERVIEW

Item number TC-DEMO-PROJ-MG-10128
BESS Size 10.128MWh / 2.5MW
Optical scale 1.6MWp
Diesel engines 2.0MW / 400V
Grid-connection voltage 10kV / 50Hz
Critical load 1.8MW
Type of project Microgrid Certification Project (DEMO)

Run binding and boundary

  • BESS charge power limit: ±1.25 MW/PCS
  • SOC operating space: 20% - 90%
  • Insular frequency range: 49.5 – 50.5 Hz
  • Single island voltage range: 0.95 – 1.05pu
  • The longest island demonstration: 30min
  • Network Synchronized Impact Control
Event Record File
Protect Action Record
Curve Evidence Files
SAT report

11 Delivery and project handover HANDOVER PACKAGE

DES Design package Chart / Calculating / Description
SAT Test and acceptance package FAT/ SAT report
OPS Run and maintain packages Operation / Maintenance Manual
EVD Incident evidence kit SOE/ Curve / Log
TRAIN Training and Delivery In situ Training / Transporting
BASE Final project baseline Configuration/ Version / Status
Completion definition of the Microgrid project: It's not "storage, photovoltaic and diesel" that's on the line, but it's from Grid Connected → Disturbance → Controlled Separation → Island → Stabilization → Resynchronization → Grid Restored Rebuild complete state change and prove Control objectives, critical loads, security protection, incident time and acceptance evidence Consistent.