Inside cabinet
- 12 HV bus
- 21 CT set
- 33 Gateway
- 37 Thermal probe
Accessories customization|Project-scoped kits
Engineering kits for large BESS — cables, connectors, install hardware, sensing, fire/thermal, tools and spares — each mapped to a real install node.
From system boundary to install, service and spare readiness Demo data
Ten inputs that decide standard, optional and project-specific lines Demo data · TC-ACC-26-019
Every number maps to a real install node — not a parts catalog wall Demo data · nodes 01–61
Color-headed columns — each line belongs to an install zone Demo data
System interface
DC connector example — from requirement to field location Demo data · TC-DC-1500V-240A
Clear include / exclude boundaries — and where each part mounts Demo data
| Class | Prefix | Example | Owner |
|---|---|---|---|
| Standard | TC-STD… | HV harness · labels | Ships with BESS |
| Optional | TC-OPT… | Spare contactor | Order add-on |
| Project custom | TC-PRJ… | Custom tray / gland | Project BOM |
| Customer supply | CUS-… | Site tray steel | Customer |
| Commission tools | TC-TOOL… | Torque · HV probe | FSE kit |
| Recommended spare | SP-… | BMU · fuse pack | SLA stock |
Insulation & protection · metering & status — demo lines Demo data
| Item | Spec | Location | Status |
|---|---|---|---|
| HV harness set | M12 · 350 A demo | Rack rear | RELEASED |
| Ground kit | M10 · 35 mm² | Base frame | RELEASED |
| Gland plate | IP54 · site cut | Cabinet bottom | PROJECT |
| Surge / fuse pack | IEC demo | DC gallery | OPTIONAL |
| Item | Spec | Location | Status |
|---|---|---|---|
| CT set | Class 0.5 demo | DC / AC | RELEASED |
| Temp sensors | NTC · aisle | Thermal path | RELEASED |
| Energy meter | Modbus | AC panel | OPTIONAL |
| Insulation monitor | IMD IF | HV compartment | PROJECT |
Network and HMI lines plus debug / operate / critical / consumable buckets Demo data
| Item | Spec | Role | Status |
|---|---|---|---|
| Ethernet switch | 8-port demo | Cabinet LAN | RELEASED |
| SFP modules | 1G · fiber | Uplink | RELEASED |
| Protocol gateway | CAN / Modbus | BMS–PCS | PROJECT |
| HMI / clock | Panel mount | Local UI | OPTIONAL |
| Bucket | Policy | Example | Horizon |
|---|---|---|---|
| Commissioning | Ship-with kit | Torque · probe | FAT / SAT |
| Operations | On-site chest | Labels · fuses | Ongoing |
| Critical | 1 / 6 cab demo | Contactor · BMU | 2-yr SLA |
| Consumable | Reorder pack | Filters · tags | Quarterly |
Lifecycle coverage
Kits stay attached to the operating phase, not a one-time uncrate event Demo data
Governance dashboard bound to configuration instance TC-ACC-26-019 Demo data · rev V1.3
| Accessory | Cabinet | PCS | EMS | Result |
|---|---|---|---|---|
| HV harness | PASS | PASS | — | PASS |
| Gateway | PASS | PASS | PASS | PASS |
| Gland plate | COND | — | — | COND |
| Fire IF | PASS | — | PASS | PASS |
| Check | Evidence | Result |
|---|---|---|
| Interface match | Matrix V1.3 | PASS |
| Torque sample | Log sheet | PASS |
| Packing vs BOM | Crate list | PASS |
| Site receipt template | Form | TEMPLATE |
Ten artifacts that close the accessories package Demo data