Once the system is assembled,
close every remaining engineering boundary

The completion of door boards, seals, cables, interfaces, identification, mechanical co-operation and the final closure of environmental boundaries, and the “assembly completion” of large-scale Energy Storage Systems into a truly testable, verifiable and deliverable product state.

Final assembly is not cosmetic finish—it closes engineering boundaries into a verifiable product.
Seal and Gap
Mechanical interface
Identity
System ID TC-DEMO-ESS-2608-006
Work Order TC-DEMO-WO-FA-L01-2608-006
Status ENVELOPE CLOSEOUT
Image Points 64 / 64
Open Final-Assembly NCR 0
Destination ELECTRICAL TESTING

System assembly master plan All final boundaries are closed here

01
02
03
04
05
06
07
08
09
10
11
12
13
14

Mechanical closure verification Let's do the size, gap and assembly for the last time.

Final-assembly dimensions and door-closure verification

Door opening 0.6 mm
Gate frame gap 3.1 mm
Container alignment 3.1 mm
High

Critical dimensions and functional validation

Item Request Result Decision
Maximum deviation from door/ cabinet ≤1.5 mm 0.8 mm PASS
Panel gap 3.0 ±1.0 mm 2.7–3.4 mm PASS
The door's closed. 100% 100% PASS
Airlock 0 is missing 0 PASS
Open the door! No interference. No interference. PASS
Anomalous discovery. Door openings exceed target.
2.1 mm > 1.5 mm
HOLD
Problem positioning Chain / Door Frame Location Review
Positioning complete.
Corrective measures Repositioning parallels to the door
Implemented
Repeated results Rescale full position
0.7 mm
PASS
NCR Closed TC-DEMO-NCR-2608-0073
CLOSED ✓

Wires and interfaces. Routes, fixes, interfaces, markings closed at the same time

Wire real installation status

Wire route and partition

Battery side PCS side HV+ HV- LV / IO CAN / ETH PE

Key interface details

High pressure connector Twipe / Lock
PASS
Busbar connection Insulation / protection
PASS
Low pressure end Port / pull
PASS
Communications interface CAN / Ethernet
PASS
Waterline, pick up. Leak / Lock
PASS
Pressure interface Block / Seal
PASS
Cover. Interface protection
PASS
Local interface PE continuity
PASS
Tag confirmation Interface Identity
PASS

Environmental boundaries Seal, protective, material and long-term environmental capability closed together

System shell environmental boundary

1
2
3
4
5
6
Seal continuity
Wire entrance.
Ventilation / Shiva
Waterproof top.
Drain Path
Location and marking

Cross-section of materials and structures

Door Frame Sealed Continuous compression
Panel Sealed Waterproof.
Cable entrance. IP protection
Liquid interface Seal leaks.
Blanche. The net.
Item Request Result Decision
Seal compression 25–35% 28–32% PASS
Seal continuity 100% Continuous PASS
Wire entrance. Full seal. Qualified PASS
Drain Path No congestion Clear. PASS
Secure. 100% 100% PASS
Open Status 0 Open 0 PASS

Identification and security identification maps The equipment must be identified, marked and physically matched.

1
2
3
4
5
6
7
8
9
10
11
12

Process integrity and image evidence The end state must be proven.

Image point 01: The front left corner of the cabinet, the door gap and the placard status are recorded.

Release to test area When the mechanical boundary is closed, the system goes into electrical authentication.

Standard and evidence maps

ISO ISO 9001 Quality system and controlled records
IEC IEC 60664-1 Insulation.
IP IEC 60529 IP protection level
ENV IEC 60068 Environmental validation
COAT ISO 12944 Preservative and coating
GAP Door stitches/ gap norms Mechanical closure requirements
CAB Wire and interface specifications Route, fix, twist.
ID Identity and identification System ID Consistency
64 64 point proof of image End state record