SOLAR + STORAGE PROJECTS | Solar + Storage Projects
# Let the oscillating light output #
Conversion into planned, controlled project power
DEMO PROJECT
TC-DEMO-PROJ-PV-5064
5.064MWh / 1.25MW
Photovolt + Storage Control Demonstration
Optical Array
Solar Field
Reverser
PV Inverters
Conversation bus
AC Bus
Energy Storage Systems
PCS + Battery
step-up transformer
Transformer
& Net / Connect Point
Grid / PCC
1 Physical primary system and field mapping
Reverser PV Inverters
AC Bus
Energy Storage Systems BESS
Transformer
Network / PCC
2 Core input for planning and control Scroll Forecast Input
Organisation
Weather & Irradiance
Photovoltage prediction
PV Forecast
SOC reservation/ window
Reserve & Window
Network Plan / Schedule
Grid Requirement
Availability of equipment
Availability
Organisation
Weather and irradiation projections determine future photovoltaic resources and are important inputs for current and future plans.
3 The predictions are not the result. Closed-loop control is the plan.
00:00
06:00
12:00
18:00
24:00
4 Evidence of control effects Typical Day
Volatility Smooth
Original PV → PCC controlled power
Discard light absorption
Discard the light for improvement.
82.6%
Storage Power Control
Recharge following prediction error correction
Plan tracking
Plan tracking MAE
2.18%
5 Solar system structure and interface boundary
Communication Concord
Direct Convergence DC
Communication coupling:
The PV reversers and BESS PCS have separate access to the communication terminals, with clear interface boundaries and suitable for increased storage capacity in existing photovoltaic fields.
6 Environment and site constraints
7 Equipment configuration and traceability Critical equipment
| System | Equipment | Specifications / Model (example) | Key parameters | Number | Retroactivity |
|---|---|---|---|---|---|
| Optical interface | Serial Inverters | TC-1000KTL-HV | 100kW / 1500Vdc / Multiroad MPPT | Twelve. | Serial Number / Solid |
| Energy batteries | Batteries | TC-LFP-280Ah | LFP / About 1331 Vdc | Four. | Core / Pack Trace |
| Resilient transformer | PCS | TC-PCS-1250K | 1.25 MW / Two-way AC-DC | 1 table | Serial Number / Solid |
| Energy Management | EMS | TC-EMS-3000 | Forecast / Plan / Schedule / PCC Control | 1 set | Version / Configuration |
| Pressure-up system | step-up transformer | Project Customisation | 35kV Internet interface | 1 set | Emblem / Test Report |
| communications systems. | Industrial exchanges | TC-ICS-2000 | Fibre / Industrial Network | 1 set | Port / Configuration Backup |
8 Delivery and debugging process
- Device functionality testing
- Protect lock authentication
- Communications and control tests
- Incoming and accepted
- Install and connect
- Insulation and ground testing
- Telemetry / Remote Message
- Organisation
- Clock Sync
- Forecast Validation
- BESS Reconciliation
- Plan tracking
- Comparison of indicators
- Archives of evidence
- Sign on site.
9 Run Evidence Typical Day
Energy Flow (MWH)
Photovoltaic power generation
23.56
Direct Internet access
17.89
Storage charge.
5.67
Storage power discharge.
5.34
Abandon Light
0.42
Planned VS Real Power
SOC Track
Battery cabinet temperature distribution (°C)
Availability
98.72%
Typical statistical cycle
Alarm closed loop
Total alarms
7
Closed
7
Unclosed
0
10 Depth of representative project: TC-DMO-PROJ-PV-5064
Project information
| Type of project | Photovolt + Storage Control Project |
| Project size | 5.064MWh / 1.25MW |
| Grid-connection voltage | 35kV |
| Time of shipment | 2024-10 |
| Main objectives | Smooth Volatility / Plan Tracking / PCC Control |
Plan tracking MAE
2.18%
Improved forecast errors
0.21%
Droplight Improvement
82.6%
Availability
98.72%
Key constraints
- High altitude, dusty operating environment
- Site altitude around 3,600 m
- The light zone is far away from the storage area.
- The lifting station forms an independent border with the PCC.
- Scroll revision of day plan
Nearly seven days running evidence
11 Delivery and handover results
Let Solar+Storage Projects achieve real running evidence
From forecasting, planning, dispatching to PC feedback, complete traceable project control closed loops.