PRE-SHIPMENT INSPECTION

Before packing,
make the order, physical goods, and delivery evidence
fully consistent

PSI is a final delivery check after FAT and before formal packing. It does not repeat FAT—it confirms that the customer order, approved configuration, physical goods on site, serialized parts, accessories, documents, and delivery evidence all belong to one engineering baseline.

Passage by PSI means that the system is duly authorized “to allow access to the packaging phase”.
FAT Completion Conditions PASSED
FAT not closed bias 0
CFG 42 / 42 Configuration Item MATCH
SN 18 / 18 Sequenced Widget
CHK 64 / 64 Process and Appearance
ACC 27 / 27 Annex and spare parts COMPLETE
DOC 16 / 16 Controlled CURRENT REV.

Order baseline and delivery in kind, cross-referenced

Client / project configuration baseline

System Model TC-ESS-5.2MWh
System configuration 9 Cabinets / 18 Racks
Battery Model LFP 280Ah / 9S2S
PCS TC-PCS-2500K-MV
EMS TC-EMS-3000
BMS EMS 3.2.4 / BMS 2.6.1
Languages ZH / EN
Ventilation / HVAC HVAC R04 / Heat Management
Security system NFPA 855 / IEC 62933
Communications MV 3.6kV / Modbus TCP / IEC 61850
System ID
TC-DEMO-ESS-2608-006

PSI cross-check

TC-ESS-5.2MWh ✓
9 Cabinets / 18 Racks ✓
LFP 280Ah / 9S2S ✓
TC-PCS-2500K-MV ✓
TC-EMS-3000 ✓
EMS 3.2.4 / BMS 2.6.1 ✓
ZH / EN ✓
HVAC / DC cabinet / heat management ✓
NFPA 855 / IEC 62933 ✓
MV / Modbus / IEC 61850 ✓

Not just one door, but a full system delivery.

Surface Status
No injuries, no contamination, no structural deformation.
Marks and Identity
All devices numbered and configured
Ventilation and heat dispersion
Wind mouths, filters, full of leaf.
Interface protection
All external interfaces secured.
Bottom / Hangpoint
Fixed, assembled and complete transport boundary
Door / Sealed
Door locks, gapes, seals and openings are normal.

Every serialized component must return to the approved configuration

Rack 18 / 18
PCS 2 / 2
EMS 1 / 1
HVAC 4 / 4
Fire 2 / 2
BMS Control 18 / 18

Annex integrity checked by transport unit rather than small commodity presentation

27 / 27 Annex and completeness of spare parts
controller attachment Number: 5
Communications cables Number: 6
Maintenance attachments Number: 9
Security Annex Number: 9
Protection and protection Number: 9
BMS controller Number: 2
Fan module Number: 2
Seal Quantity: 6
Plugin Number: 4
Tools and Debug packages Number: 1

Delivery of equipment must use the same scope baseline as controlled documents

Client/ Project Files Version Languages Status
System Specifications R04 ZH/EN Current
Electrical drawings R04 ZH/EN Current
Interface Control File R04 ZH/EN Current
Communications norms R04 ZH/EN Current
Validate / Deliver File Version Languages Status
FAT Test Report R01 ZH/EN Current
Type test report R01 ZH/EN Current
Statement of consistency R02 ZH/EN Current
Maintenance manual R02 ZH/EN Current

Controlled exceptions: expired (closed)

Organisation

Events TC-DEMO-PSI-OBS-0004
Category Attachment Label
Object Communications cable bag
Problem Label Version R01
Request Current Version R02
Disposal Replace and recheck
Status CLOSED

Label Correction

TIANCHU
COMMUNICATION CABLE KIT REV: R01 DATE: 2024-06-10
→
TIANCHU
COMMUNICATION CABLE KIT REV: R02 DATE: 2024-08-15

PSI's conclusion is not a hook, but an authorization.

PASS Compliance
HOLD Unclosed problem
RECTIFY Implementation of corrections
RECHECK Recheck
PASS: All delivery conditions are met and access to the PSI approval process is available.
FAT PASSED Preconditions met
PSI REVIEW Orders and physical reconciliations
APPROVED FOR PACKAGING Authorized Packaging
PACKAGING HANDOVER Transfer to Packaging Team
DISPATCH In the next stage,

PSI Handover Record Authorization package

APPROVED FOR PACKAGING
System ID TC-DEMO-ESS-2608-006
Project orders TC-DEMO-POJ-2608-021-R04
System Weight 2.5MW / 5.016MWh
Date of inspection 2024-08-18
Plant TIANCHU Manufacturing Base
PSI report TC-DEMO-PSI-2608-006-R02
Configuration 42 / 42
SN reconciliation 18 / 18
Checkpoint 64 / 64
Annex 27 / 27
Documentation 16 / 16

Delivery results With system delivery

PSI PSI report Pre-Shipment Inspection
CHK PSI Checklist Inspection Checklist
CFG Configuration baseline Configuration Baseline
PROC Process validation evidence Process Evidence
ACC List of annexes Accessories List
DOC Index to Controlled Files Controlled Documents
IMG PSI photo kit Inspection Images
APP Packaging authorization records Packaging Approval