Integrated lithium battery energy storage solutions

Configuration response, maintenance,
Health assessment, spare parts and engineering support

Large BESS All Lifecycle Services
More usable, lower risk, lower cost, longer life.
CAP
Size of assets (example)
Project level BESS
Capacity by project programme
SYS
Composition of assets (example)
Multi-system coordination
Core systems such as PCS / BMS / EMS
LIFE
Service cycle
10+ years
Debugging to upgrade extension
KPI
Service objectives
Full life cycle optimization
Increased availability, reduced downtime impact, optimized TCO

All Lifecycle Services

01
Asset and risk inventoryIdentification of critical assets
Assessment of operational risks
02
Definition of scope of servicesMatch risk levels
Configuration service modules
03
Service benchmarking matrixClarifying the line of responsibility
Build service baselines
04
Annual Service PlansAnnual planning
and resource arrangements
05
Response and Upgrading MechanismRating Response
Disposal by Level
06
Performance evaluationData driver
Evaluation improvements
07
Continuation and optimizationDynamic adjustments
Continuous value added

Large BESS All Lifecycle Services (Deeply bound to operational phase)

Project Management
Preparation for delivery

Key objectives

  • System security handover
  • Information archive creation
  • Transfer of skills of personnel

TIANCHU Service Focus

  • Debug Support
  • Information Initialization
  • Receiving and inspection support
  • Transmitting
Debugging and acceptance0 – 3 months

Key objectives

  • Steady luck.
  • System Parameter Solid
  • Question Closed Loop

TIANCHU Service Focus

  • System Inspection
  • Parameter Optimization
  • Question Closed Loop
  • Run Support
Run early3 – 12 months

Key objectives

  • Stable and efficient operation
  • Strategy Optimization
  • Anomalous warning.

TIANCHU Service Focus

  • Preventive Maintenance
  • Health monitoring
  • Spare parts security
  • Run Optimization
Stable running1-5 years

Key objectives

  • Maximize Availability
  • Cost optimization
  • Increased available capacity

TIANCHU Service Focus

  • Health monitoring
  • Preventive maintenance
  • Spare parts security
  • Run Optimization
Mid-term evaluation5 - 7 years

Key objectives

  • Health status assessment
  • Risk re-identification
  • Life expectancy

TIANCHU Service Focus

  • Full Health Assessment
  • Life expectancy assessment
  • Risk classification
  • Proposal for replacement
Upgrade7 – 10 years

Key objectives

  • System upgrade
  • Performance enhancement
  • Technical iteration

TIANCHU Service Focus

  • Engineering design support
  • Reform implementation
  • Transfer test certificates
  • Impact assessment
Extended Run10 years+

Key objectives

  • Longer asset life
  • Maximize Value
  • Stand by for a smooth exit.

TIANCHU Service Focus

  • Longevity Policy
  • Key parts replacement
  • Ongoing monitoring
  • Demobilization planning

Service Coverage Matrix (Responsibility and coverage)

ServicesBasic support
Essential
Enhanced support
Advanced
Advanced support
Premium
Engineering support
Engineering
Remote monitoring and alarm management●●●●
Remote response and trouble management●●●●
Preeventive Maintenance / Periodic Inspection●●●●
Health monitoring of key components—●●●
Battery health assessment and life expectancy—●●●
Performance optimization and strategy debugging—●●●
Spare parts security and management——●●
Project——●●
Upgrading and extension programmes——●●
Annual health report—●●●
KPI Performance Assessment and Improvement——●●

Annual Service Plans and Service rhythm (example)

Q1
  • Annual Health Check and Risk Count
  • Annual maintenance and Service Plans confirmation
  • Inventory and replenishment of spare parts
Q2
  • Spring
  • Performance optimization adjustments
  • Data and operational analysis
Q3
  • Specialized summer inspections
  • System parameters review
  • Mid-term health assessment
Q4
  • Autumn Winter
  • Annual health assessment
  • KPI Evaluation and Improvement Recommendations

Response and Upgrading Mechanism

Response time frame (target)

P1
First-degree alarm.In 15 minutes. Response
P2
Level 2 alert.In 30 minutes. Response
P3
Level 3 alert.Two hours. Response
P4
General issuesTwenty-four hours. Response

Upgrade Process

ALM
Alarm triggered
REM
Remote diagnosis
ESC
Link Upgrade
FIX
Problem resolution and recovery
RCA
Root analysis and improvement
Closering Authentication

Upgrade Organization (example)

Client satisfaction
Project Management
Service Delivery Manager
Professional delivery team
Battery / PCS / EMS / Electrical
Field Service Engineer

Spare parts security strategy

L1

Classified spare parts management

Key / Critical / General spare parts hierarchy management, with inventory configured according to risk and delivery cycle.

KIT

Spare parts for minor and major repairs

High-frequency maintenance components are tiered with fail-safe components to increase the recovery rate on site.

OPT

Dynamic inventory optimization

Dynamic adjustments to spare parts stocks and priorities based on health and failure trends.

LOG

Rapid redeployment strategy

Regional warehouses work with the field to increase efficiency in the allocation of critical spare parts.

LIFE

Spare parts full process management

Retrospect the life cycle of spare parts, from warehousing, access to replacement, and retrospect.

Annual health assessment and reporting (Example output)

TIANCHUAnnual Health Assessment Report2024
01
Asset health ratingSystem / Subsystem / Key Widget Rating
02
Performance trend analysisAvailability / Efficiency / Energy / Charge Performance
03
Risk and risk identificationRisk classification / Risk trend / Suggested improvements
04
Prognosis and Transport RecommendationsResidual life / replacement strategy / Optimization proposal
05
Value analysisOperational returns / Cost analysis / Investment recommendations

KPI Performance Assessment (example)

KPI IndicatorsDefinitionsTarget value (example)Frequency of assessment
Availability (A)Actual / Total Time Available≥ 98.5%Month
Number of critical malfunctionsCumulative breakdown/ annual runningKeep it down.Month
System Efficiency (RTE)Recharge / Charge Energy≥ 86%Month
Alarm handling timelinessClose the ring on time.≥ 95%Month
Plan to maintain a closed circle rateComplete maintenance project / plan maintenance item≥ 95%Quarterly
Client satisfactionClient annual rating90 minutesYear

Continuation and optimization (Self-adaptation)

DATA
Run data depositionBuilding knowledge assets
RISK
Risk re-evaluationRefocusing of services
OPT
Service programme optimizationUpgrade of input outputs
RES
Resource and spare parts optimizationReducing inventories and costs
REN
Renewal programme confirmedSafeguarding long-term value

All Lifecycle Services.
Support system operation maintenance as contracted

From shipping, maintenance, health assessment to upgrading, a verifiable and optimized service closed loop is established.