Integrated lithium battery energy storage solutions
PERFORMANCE ANALITICS | Storage Performance Analysis

Turn operating data into comparable,
traceable system performance

Use the energy boundary as baseline and let measurements speak. Bring battery DC, PCS, transformer, grid metering, and auxiliaries into one energy ledger so every efficiency, availability, and improvement conclusion can be reviewed, verified, and traced.

M Energy boundaries clear.
Q Validity of measurements
R Calculator can be repeated
B The same conditions are comparable
BESS
Battery DC Battery DC side
M1
DC
PCS DC In PCS DC input
M2
AC
PCS AC Out PCS AC output
M3
TR
Transformer Main variable measure
M4
RM
Revenue Meter Networking balance
M5
GRID
Grid Grid Connection Status
BOUNDARY
HVAC / cooling system MAUX-1
Fire Systems / Fire Systems MAUX-2
Control & Standby/ Control Standby. MAUX-3
M1 · Battery DC: Battery system direct flow total input/output boundary. As the starting point for the RTE master account on this page, cumulative energy is 21,448.7 MWh.
Calculating period (monthly) 2025-05-01 — 2025-05-31
Net output M5 18,732.6 MWh
RTE RTE 87.35%
System availability 98.62%
Measuring data integrity 99.18%
Data availability 99.72%

01 Defining performance boundaries and measurement points

Measures Name Annotations
M1 Battery DC BCMU / DC measurement chain
M2 PCS DC In PCS DC input side
M3 PCS AC Out PCS AC output side
M4 Transformer The transformer downstream / before netting
M5 Revenue Meter Clear-scale network measurement
MAUX Auxiliary Load Refrigeration, firefighting, control and standby systems
Time frame: The metrology chain uses a uniform time synchronisation; analysis of the particle size is 15 minutes, and original SCADA/EMS data retain a second time stamp.

02 Energy reconciliation and data availability

Original Measurement SCADA / Meter / BCMU
Quality verification Completeness/ Time series/ Scope
Data Cleaning Missing / Repeat / Abnormal
Reconciliation Border coherence
Analytical data sets Interval Dataset
99.72% Available
Effective data 99.72% Missing data 0.20% Anomalous data 0.08%

Missing / Abnormal

One minute. Allow for the repair of shortage points based on proximity
1-6 hours Match and maintain mass tags using the same profile
> 6 hours Not entering formal performance conclusions
Principles Keep source and algorithm versions of any recovery data

• Efficiency and loss landscape Energy flows this month.

(b) Auxiliary energy consumption is an explanation of the loss, without double deduction.
21,448.7 MWh Battery DC · M1 100.00%
21,345.2 MWh PCS DC In · M2 99.52%
19,740.9 MWh PCS AC Out · M3 92.03%
19,102.6 MWh Transformer · M4 89.06%
18,732.6 MWh Revenue Meter · M5 87.35%
Batteries differ from straight-stream sides 103.5 MWh 0.48%
PCS conversion losses 1,604.3 MWh 7.48%
Depletion of transformers 638.3 MWh 2.98%
Lines and support differences 370.0 MWh 1.72%
Measuring RTE 87.35%
Total losses 2,716.1 MWh · 12.65%
Line / Supplementary Difference 1.72%

04 Availability Timeline This Month

Available Run Limit running Planned maintenance We're down. Invalid Data
Event Type Length Do I count down? Annotations
Planned maintenance 4.0 h By contract calibre PCS / Refrigeration
Unplanned failure 6.3 h Yes. Protect Action / System Restore
Power Limit 18.4 h Yes The system is still in service

05 Power response assessment Example of an FM event

Command tracking success rate 99.18%
Response delay 1.23 s
Ten percent rise time. 4.21 s
Superb 2.18%
Steady state error 0.73%
Schedule scene One-time FM
Command band value 100 MW
Duration About 12 min

06 Normalization approach For comparability

T Temperature homogenization Map to 25°C base
SOC SOC Window 20-80 per cent unified window
P Load / Multiplier Match similar power ranges
MODE Run Mode Charge / discharge / standby
DQ Data integrity Availability 99%
The same Benchmark object enters a horizontal comparison only after SOC, temperature, power, mode of operation and data quality meet the matching conditions.

07 Horizontal comparison Once it's consolidated,

Object Power / Capacity RTE Availability Command tracking success rate
Site A 100 / 200 87.35% 98.62% 99.18%
Site B 100 / 200 86.21% 97.94% 98.71%
Site C 50 / 100 85.08% 97.21% 98.12%
Site A · 100MW / 200MWh
Site B · 100MW / 200MWh
Site C · 50MW / 100MWh

• Decomposition of losses Example: RTE is below baseline 1.85 pct

Break “low efficiency” into actionable engineering causes instead of stopping at a single KPI.
Loss item Offset Main reasons Associated device/ system Evidence
PCS efficiency deviation -0.48 pct Inadequate efficiency between low loads PCS-03 / 06 Efficiency Curve / Run Distribution
The transformer's out of control. -0.92 pct Increased low load running time Master TR1 Enter / Output Measurement
Energy consumption of auxiliary systems -0.31 pct Refrigeration system operation strategy HVAC / EMS Secondary measures
Lines and other -0.14 pct Busbar / line loss AC / DC Line Border reconciliation

09 Improve tracking

Found / Problem Measures taken Baseline period Improvement period Validate proceeds Responsible persons Evidence
Optimization of PCS low-load efficiency Optimizing low-load control logic and improving efficient area coverage RTE 87.02% RTE 87.92% +0.90 pct Run Manager Policy Change / Efficiency Curve
The cooling system's auxiliary energy is high. Adjust cooling temperature differentials and start-up strategies Auxiliary energy consumption 0.56% Auxiliary energy consumption 0.49% -0.07 pct Transport Manager Control Parameter / Energy Consumption Trends
The transformer has a lot of low load time. Optimizing PCS schedule and transformer load distribution Loss 1.05% Loss of 0.87 per cent -0.18 pct Dispatch manager Power Distribution / Energy Reconciliation

10 Border description

This page shows Measured Performance / Actual PerformanceI don't know. Any projection, optimization target or Benchmark conclusion must be clearly distinguished from measured data.

DATA Performance measurement This Page
OPT Plan for optimization Improvement targets
BENCH Benchmark Normalization

• Output list

✓ Performance analysis reports and monthly findings
✓ Measurement Pixmap and Meter Map
✓ Interval Dataset after reconciliation
✓ Details on efficiency and losses
✓ Evidence of availability and downtime events
✓ Power response test report
✓ Description of the methodology
✓ Horizontal Comparison Data Set
✓ Improvement of validation reports for measures

Data and compliance

Data sources SCADA / EMS / BCMU / PCS / Revenue Meter
Data saving 3 years
Time Sync NTP / PTP, deviation 1 s
Audit tracking All calculations and changes recoverable
Compliance principles Borders, algorithms, data versions are controlled.