Ensure BMS, EMS, PCS, cooling, fire interfaces, and protection logic transition correctly under a controlled state machine across normal, limited, fault, manual-intervention, and recovery scenarios.

Functional validation answers how the system should act — not by repeating performance or life tests.
LARGE STATIONARY BESS 5.064MWh / 1.25MW
System TC-DEMO-ESS-2608-006
Requirement Set TC-DEMO-FRS-2608-006-R04
Scenario Library TC-DEMO-FVT-2608-006-R02
Current Scenario SC-47 / FIRE INPUT LATCH
Cases / Status 64 REGRESSION IN PROGRESS

System status machine Based on functional safety and system-level requirements

OFF Interrupted mode
PRECHARGE Prefill
INIT Self-censorship.
READY Ready
DERATE Decline
CHARGE Charge State
DISCHARGE Discharge state
FAULT Fault
SAFE SHUTDOWN Clear.
Autoprecharging OFFF →RADY 18.6 s
INIT → PRECHARGE 6.4 s
READY: All key locks meet, unstoppable failure, and the system can be charged or discharged.

Commands and Permissions Real Value Table Each order must meet the conditions of status, authority and Guard

Time Command Source Current Status Command / Request Guard conditions Expected action Result
10:20:11.223 EMS READY Set Power Limit SOC <95% Limit Power PASS
10:20:11.453 BMS READY State Transition Self Check OK Status Permission PASS
10:20:11.703 Operator READY Mode → Discharge Permission valid. Mode-building PASS
10:20:12.045 EMS DISCHARGE Set Power 1.25MW Limited satisfaction Implementation objective PASS
10:20:12.715 Maintenance DISCHARGE Maintenance Mode User Authorization Prohibition orders PASS
10:20:13.210 EMS DISCHARGE Stop Effective Stop Power zero. PASS
10:20:13.998 E-Stop ANY Stop! Hardwired Clear. PASS
EMS power limit: READY states that EMS is limited in power, and the system validates SOC, heat state and communication.

Thermal control. The cooling system's real status check.

Key Event Timeline

Manual temperature injection
PASS
Cool pump feedback
PASS
High temperature
PASS
Lack of pressure and protection
PASS
Restore control.
PASS
Significant recovery time 1.2 s P95
Reduction response 2.0 s P95

04 Electrical and protective engineering laboratory HIL / fail injection and protection response validation

Fault injection. Injection Event Expected response time Actual response Result
Overpressure injection. DC 110% Un <500ms 312ms PASS
Unpressure injection. DC 70% Un <500ms 296ms PASS
Overflow injection 1.5× In <300ms 162ms PASS
Insulation alarm Isolation Alarm <500ms 420ms PASS
The contact's abnormal. Weld Feedback <200ms 145ms PASS
Stop! E-Stop <200ms 118ms PASS
t0 Fault injection.
+60ms Test complete.
+80ms Protection decision-making
+120ms Contact Actions
+145ms Status confirmed
<220ms System into security.

Communications and fire interfaces

DET Test Offline node / fail input / fire trigger
BMS BMS / EMS Synergy Status assessment, failure assessment, security strategy
PWR Power isolation PCS limit / shutdown / power zero
VENT Ventilation / Firework Link Wind, fire, door locks, safe return.
LOG Notifications and records HMI / EMS / Event Log
SAFE Communication to safety. Functional verification PASS
Result SC-47 Exceptions (only, closed)
Initial Trigger SC-47 enters the fire input lock and Alert & Reset path does not match demand.
REQUIREMENT VIOLATION
Release block. This post is part of our special coverage Syria Protests 2011.
RELEASE BLOCKED
Corrective Measures ECR Update the demand explanation, PLC status machine and HMI description.
ECR CREATED
Full Return Full 64 Cases Renewal.
64 CASES RETEST
Corrected results Keep the locks correctly and revert to the authorized logic.
PASS · NCR CLOSED

64 covered maps Area Library Integrity

scene category Total First adopted Adopted as amended Final pass. Coverage
Normal 10 10 0 10 100%
Start / Stop 8 8 0 8 100%
Power limits 8 8 0 8 100%
Thermal management 10 10 0 10 100%
Electrical protection 12 11 1 12 100%
Communications 6 6 0 6 100%
Fire/ Interface 6 6 0 6 100%
Recovery process 4 4 0 4 100%
Total 64 63 1 64 100%

Need to close the evidence loop. Release from demand to final function

REQ Requirement Functional and security requirements
SC Scenario SC-01 → SC-64
COND Initial Condition Create Initial Status
EVT Injected Event Command / Fault Input
EXP Expected State Expectation System State
RAW Raw Logs Event / Report / Wave
REG Regression / Release Return and Final Release
Functional Needs FRS / Requirement Set
Site Library 64 Scenario Cases
HIL RECORDS Injection Logs
Events and reports Event / Packet Logs
Test Results Pass / Fail / Timing
Regression Regression Report
Factional Administration Report Signed Verification

We have to make every change in the state a basis.
Leave evidence for every fault response

Sixty-four functional scenarios have been completed for final return, SC-47 has exceptionally preserved the full history, and all access to the Cristical/Major functionality has been closed before the system has been technically authorized to enter the final test and FAT phases.

Stage boundary: FUNCTIONAL BEHAVIOR VERIFIED denotes status machine, permission, failure response, heat control, communication/fire-fighting connection and 64 system scenes have been validated. It only authorizes access. Final Testing / FATThis does not mean that FAT itself has passed, nor that PSI, packaging or shipment has been completed.