Integrated lithium battery energy storage solutions
Requests for services and case management Service Request & Case Management

Let a service request,
From asset context to authentication close
There's always someone responsible and documented.

Full-process service closed loops for large power storage stations, creating a unified case context around real assets and operating data, linking client requests, duty-bearers, remote experts, field teams, spare parts and engineering support in the same chain of evidence, from request entry until final validation is closed.

The whole journey of a case.

The following is an indicative service synergetic process and does not represent real operating conditionssheets or power station performance

Indicative case: CASE-DEMO-0017Example station . Scale as interface presentation only
• Process indications
1Requests and admissibilityClient 05-20 08:41Client APP / Portal Submission
2Severity and asset contextSystem 05-20:43Identification of impacts and scope of assets
3Distribution of ownership rightsService Manager 05-20:47Designation of duty-bearers and teams
4Evidence collection and linkagesRemote expert 05-20 08:52Auto-association of classified evidence
5Diagnostics and action plansRemote expert 05-20:15Root analysis and disposal recommendations
6Upgrading and synergyService Manager 05-20:02Upgrade / Spare parts / Field resources
7On-site implementation and recoveryField team 05-20:18Implementation of disposal and resumption of operations
8Validation and confirmationClient 05-20:42Run validation and confirm
9Close and ArchiveSystem 05-20:05Archived evidence and final records
10Rewinding and preventionCIE|05-22 08:30Reassess risk and create preventive measures

Case Critical View

Verify Restore

✓
Operation recovery and stabilization
Restored state of operation verified
Network power50.2 MW
SOC52.3%
Activity warning0
Recovery Time 3 hours, 41 minutes.Authentication status PASS

Asset identity and context

Power station Site 100 MW / 200 MWh
Site ID ZBK-100-200
Run Status Running (connected)
Assets affected
Cabinet BC01-07
The cabinet. RACK-07-03
PCS PCS-07-03-01
Batteries BAT-07-03-09 ~ 12
Software Version PCS 2.3.7 / BCU 1.8.4

Evidence package (associated automatically)

ALM
Alarm snapshot 05-20 08:41:12
TRD
Trend curves 08:41 – 08:50
EVT
Event Record 08:30 – 08:50
LOG
Run Log 08:40 – 08:50
CFG
Configuration Change Record 05-19 23:12
ENV
Environmental data 05-20 08:40
PIC
Live Photo / Video 05-20 12:18
Total evidence: 27 items Associated integrity: 100%

Ownership & Upgrade Path

Service Manager Morning. Case Owner/ Main Responsibility People
Remote expert Engineering / Electrical
Remote expert Thermal management/ control
Field team Transport / Repair
Coordination of spare parts Spare parts and logistics
Engineering support R / E
Upgrade policy: It automatically escalates by impact and complexity, while retaining those responsible throughout the process.

Remote · onsite · spare-parts coordination

REM
Remote expert Real time diagnosis, guidance on site disposal
Completed
SITE
On site. Replacement of components, validation recovery
Completed
PART
Spare parts security Transfer of spare parts and logistics tracking
Completed
Key spare parts: Fan module x 2 (replaced)

Verify Restore

✓
Operation recovery and stabilization
Restored state of operation verified
Network power 50.2 MW
SOC 52.3%
Activity warning 0
Recovery Time 3 hours, 41 minutes. Authentication status PASS

Close Record

Close Time05-20 13:05
CloseSystems (service manager confirms)
Client confirmationConfirmed
Evaluation of satisfaction
★★★★★
Knowledge CaptureSinked to the knowledge base
Related issuesNone

Trash analysis and preventive measures

Gene.

The ageing of the dispersing fan module has led to a reduction in heat-replacement capacity, increased local temperature and triggered protection, ultimately resulting in limited capacity.

Preventive measures
  • Same batch of fan module health screening
  • Optimizing fan life strategy (published)
  • Early warning rules to increase warming trends
  • Quarterly inspections add fan status check
Close Systems (service manager confirms)
Client confirmation Confirmed
Evaluation of satisfaction
★★★★★
Knowledge Capture Sinked to the knowledge base
Related issues None

Trash analysis and preventive measures

Gene.

The age of the dispersing fan module reduces the ability to change heat, increases local temperature and triggers protection, and ultimately limits the capacity of the cabinet.

Preventive measures
  • Same batch of fan module health screening
  • Optimizing fan life strategy (published)
  • Early warning rules to increase warming trends
  • Quarterly inspections add fan status check

Making services more retrospectable, making experience work.

From one request to one closure, the storage power company, together with its clients, made the large energy storage systems safer, more efficient and more sustainable.