From DC input, vertical series connection, and liquid-cooling distribution to RBMS addressing, pre-charge protection, and rack-level release, seven packs here become a truly controlled, verifiable high-voltage energy spine for the first time.

Seven packs here become a controlled high-voltage energy spine for the first time.

Seven positions form a real electrical series string Scan to locate; lock physical position and electrical sequence

Pack ID Status Location Measured outcome Offset Decision
PK-043 RELEASED R01 POSITION CONFIRMED 0.21 mm PASS
PK-044 RELEASED R02 POSITION CONFIRMED 0.18 mm PASS
PK-045 RELEASED R03 POSITION CONFIRMED 0.25 mm PASS
PK-046 RELEASED R04 POSITION CONFIRMED 0.19 mm PASS
PK-047 RELEASED R05 AS-BUILT LOCK OK 0.42 mm PASS
PK-048 RELEASED R06 AS-BUILT 0.31 mm PASS
PK-049 RELEASED R07 AS-BUILT 0.27 mm PASS
Pack 01: PK-043 has confirmed access to R01, mechanical position deviation 0.21 mm, which corresponds to electrical sequence.
• Scanning confirmation Bind Pack identity to rack position.
• Orientation and positioning Pack push and track match.
• Mechanical lockout Position fixed into As-Built.

high-voltage energy spine: seven packs form one controlled series path

PACK 01
PACK 02
PACK 03
PACK 04
PACK 05
PACK 06
PACK 07
Pack 01
Pack 02
Pack 03
Pack 04
Pack 05
Pack 06
Pack 07

Rack HV connectors and protection logic Airframe level

7P 7-Pack Thread Input
BUS Rack main circuit 1250A
R Precharge resistance 150Ω
PRE Prefilled contacts KM-PRE
KM+ Optical master contacts KM+
KM- Negative polar master contacts KM-
SD Service Separators Service Disconnect
7-Pack Serial: Seven Packs are designed to form high-pressure cascades, and their position, polarity and identity must be consistent.
Rack OCV 1107.5 V
Prefill completion 90% in 6.4 s
Contact feedback PASS
Insulation. 1.3 GΩ
Exposure resistance 28 mΩ

RBMS and network addressing Seven-pack identity, communications, and rack-level monitoring

Pack 07 · ADDR 07
Pack 06 · ADDR 06
Pack 05 · ADDR 05
Pack 04 · ADDR 04
Pack 03 · ADDR 03
Pack 02 · ADDR 02
Pack 01 · ADDR 01
7 / 7 ONLINE

Address-conflict resolution record(RK-09)

08:12 Address scan detected duplicate pack addresses ADDR 05.
08:13 The network protected access to Hold, prohibiting Rack from continuing to release.
08:18 Address redistributed: ADDR 05 → ADDR 06.
08:28 Rescan, 7 Pack addresses only.
08:35 NCR: TC-DEMO-NCR-2608-0064 CLOSED.
Impact assessment
Level of downstream exposure
0 Racks

Seven-branch hoses and serviceability Liquid-cooling distribution, pressure drop, and maintenance access verified together

Seven-way liquid-cooling distribution

Pack 07
Pack 06
Pack 05
Pack 04
Pack 03
Pack 02
Pack 01

Liquid-cooling design parameters

Design total traffic 9.0 L/min
Single traffic 1.29 L/min
Flow Balance ±5%
Pressure test 0.50 MPa / 120s
Allow Pressure Down 0.36 kPa
Passage ≤1.0 kPa
Maintenance of space ≥450 mm
Transit Flow Δ vs Avg
011.31+1.6%
021.27-1.6%
031.30+0.8%
041.32+2.3%
051.28-0.8%
061.31+1.6%
071.290.0%

Maintenance and authentication

0.50
MPa
Plumb pressure test 0.50 MPa / 120s, no leakage.
Maintain channel Pack and rack assemblies can be serviced independently without interfering with adjacent units.

Rack-level verification and release Rack level only — excludes system-level testing

Rack check site

Release inspection results

Pack position and lockdown 7/7 PASS
Precharging time 6.4s PASS
Serial R01→R07 PASS
Contact feedback PASS
Rack OCV 1107.5V PASS
Address Unique PASS
Insulation. 1.3 G. PASS
Pack Online 7/7 PASS
Contact resistance, 28 m. PASS
Pressure test PASS
Fluorinated flow balance PASS
RBMS Configuration PASS

Rack Proof Record Evidence bag

Rack evidence binder

Critical evidence closure status

Pack Location Record 7 / 7
Location / Lock Evidence 7 / 7
High pressure record 1 / 1
RBMS Configuration 1 / 1
Liquid-cooling evidence 1 / 1
Insulation / Prefill 1 / 1
NCR / CAPA 0 OPEN
Rack Release Certificate 1 / 1
Retrospective integrity of the rack 100%

Delivery to System Investment SYS-L01

SYS-L01
7 Packs × 1 Rack × 15 Racks in parallel = 5.064 MWh BESS

Standards and evidence framework

ISO ISO 9001 Quality management system
IEC IEC 62619 Battery system secure.
IEC IEC 60529 IP protection
HV IEC 60664-1 Insulation.
GB GB/T 36276 Lithium battery storage
IEC IEC 60068 Environmental validation
EOL Rack EOL Arrange release
NCR NCR / CAPA Abnormal closed circle

Evidence chain Key Output

1 Pack Data Identity/ Test
2 Location Record As-Built
3 High pressure record HV
4 RBMS Configuration Address
5 Liquid-cooling evidence Leak / Flow
6 NCR / CAPA Closed Loop
7 Rack release. Release