Integrated lithium battery energy storage solutions
Manufacture base first screen: Energy Storage Systems assembly Line

MANUFACTURING BASE

Manufacturing capacity from line organization to shipment

The orderly interface of the project manufacturing process is supported through assembly integration, test validation, process recording and delivery preparation.

Manufacturing systems for project delivery

Process synergy
Manufacturing organizations
Connecting materials, assembly, testing and delivery preparation
Assembly Integration
SYSTEM ASSEMBLY
Complete equipment and System Integration by project configuration
Test Validation
Factory Preparation
Support delivery with critical process checks and functional validation
Prepare for delivery
Packaging and Shipping
Complete documentation, packaging, and project shipping coordination

It's from the beginning to the beginning.

  1. 01Incoming Inspection
  2. 02Assembly production
  3. 03Black-Box Testing
  4. 04Quality gate
  5. 05Packaging and Shipping

Manufacture and delivery site

Assembly Line Schematic

The assembly station collaboratively completes key components and System Integration.

Schematic of the test equipment

Test link support function confirmation and pre-delivery inspection.

Warehousing Shipping Indication

Project delivery plan for storage, packaging and shipping links.

Quality gates and process traceability

Critical Process Information Management

Maintain traceability of information on the manufacturing process and provide a basis for project acceptance and follow-up services through key process documentation, test results and delivery documents.