Retrofit & Upgrad Services
While protecting existing operations,
Continuous upgrading of hardware, software, security and interface capabilities
Replicable and verifiable upgrading capabilities for large power plants in storage, extending asset life, maintaining system compatibility and continuously creating long-term operating value.
Minimise shutdown
Safe and manageable.
Phased implementation
Ongoing online
Maximize Value
As-Is before conversion
To-be
The same power station.
Before / After Digital Twin
Replicable upgrading life cycle
Signability: Before and after the conversion of the same large power plant Digital Twins
Efficiency cycle (example)
↓ 35%
Availability
↑ 3.2%
Energy Efficiency (RTE)
↑ 2.6%
Temperature Control
↓ 40%
Design life extension
+ 3-5 years
An upgraded capability directory by system layer Example:
| System Field | Physical structure | Control capacity | Security compliance | Extension | Maintenanceability |
|---|---|---|---|---|---|
Battery chamberCore consistency, SOH prediction, active balance | |||||
BMS LayerAlgorithmic upgrade, state estimation, balanced management | |||||
EMS / PCS LayerStrategy optimization, power control, interface upgrade | |||||
Thermal ManagementLiquid cooling upgrade, precision temperature control, energy efficiency optimization | |||||
Fire safety floorDetection, locking, fire section upgrade | |||||
Medium pressure interfaceProtection, metrology and interface standardization | |||||
Software and Platform LayerRemote O&M, digital upgrading, data services |
Migration and switching plans: phased, reversible, verifiable
Phase 0
Prepare for risk lockdown.
Phase 1
Stopper job validation
Phase 2
Subsystem Switch
Phase 3
System connectivity
Phase 4
Stable operational observation
Toggle Gate Control
G0
Configuration freeze complete
Pass.
G1
Data validation
Pass.
G2
Device Authentication
Pass.
G3
Functional Validation
Pass.
G4
Security Authentication
Pass.
G5
Stable running
Pass.
G6
Receiving and inspection signature
Pass.
Rollback
Fault back.
Restore pre-upgrading configuration
Apply Back
One key to restore the previous version
Hardware Back
Keep old / sidetrack scheme
Policy Back
Restore original control policy
Back off.
Restore original net security settings
Implementation modalities: phased, subregional, subsystems
Retrovalidation validation: comprehensive enhancement of performance, security and compliance Example:
Energy Efficiency (RTE)
Round-trip efficiencyTemperature Control (ΔT)
Maximum temperature differenceCapacity retention rate
Typical testsAvailability Increase
Annual running availability rateWe're down.
Annual average
* The above indicators are illustrative and are used to demonstrate pre- and post-reform performance validation logic.
Configuration baseline and version spectrum: traceability, auditability, sustainability
CFG
Configuration Snapshot
CR
Change records
TEST
Test report
RISK
Risk assessment
TRN
Training Records
KB
Transport knowledge base
Alteration and upgrading services, extension of the use of the energy storage systems
Alteration, promotion and coordination support is provided on the basis of project assessment, the scope of which is based on contractual agreement.
EvaluationFeasibility analysis for adaptation
ProgrammeUpgrade Path Matching Interface
Receiving and InspectionValidation by contract node
SupportRemote diagnosis and in situ synergy