Maintenance and recovery of malfunctions
Corrective Maintenance & Repair
From failure to validation recovery,
Put the system under control.
Re-entry
Engineering trouble management and recovery services for large BESS
Security priority
Risk controlled.
Evidence-driven
Retroactive judgement
Engineering Collaboration
Root orientation
Verify Restore
Ongoing
Our processing.
Engineering failure tree: from multiple threads to single point restoration to validation recovery
Take out the cause of the malfunction with real engineering evidence to restore usability by the controlled steps
BMS Evidence
- Alert / Event Record
- SOC / SOH abnormal
- Insulation changes
- Balance and Single Difference
PCS / EMS Evidence
- DC bus status
- Power fluctuations
- Communication Status
- Protect Actions
Thermal management evidence
- Temperature Trends
- Flow / Pressure Change
- Pump valve and winder state
- Thermal imaging
Fire and environmental evidence
- Smoke/ Temperature Event
- Ambient temperature and humidity
- Fire service.
- Aqueous events
Root shrunk.
Engineering repairs
Positioning failure component: BMS power supply/ communications interface
Validate recovery (layer by layer)
Functional test passed.Electricity / Communications / Control
✓
Performance test passed.Temperature/ Power/ Efficiency
✓
Protect authentication passProtect / Lock / Restore Conditions
✓
Operation observation passes.Trends / Stability
✓
✓ Controlled reconnection
Into observation period
Into observation period
Our approach
Safe, transparent and verifiable engineering maintenance and restoration
Safety isolation and risk control
- Operational permit and boundary
- LOTO safety isolation
- Energy release confirmed.
- Operational risk identification
Multi-source evidence collection and alignment
- BMS / PCS / EMS Data
- Event and alarm records
- Field test data
- Photos and original records
Root analysis and impact assessment
- Fault tree analysis
- Impact scope assessment
- Refacing risk analysis
- Rehabilitation of boundary judgements
Recovery decision and programme confirmation
- Maintenance / replacement path
- Risk and parking assessment
- Identification of spare parts and resources
- Client authorization.
Replacement / Restoration Process Validation
- Retroactive identification of spare parts
- Controlled dismantling execution
- Process parameters confirmed
- Clean and Reset
Stage & Validation
- Electricity and communication tests
- Functional protection test
- Performance Power Verification
- Network restoration test
Controlled recovery and grid confirmation
- Networking review
- Level-by-stage confirmation
- Operational Parameter Monitoring
- Return to status for signature
Repetition and preventive measures
- Fault Root Rewinding
- Update of the knowledge base
- Maintenance strategy optimization
- Screening of similar assets
Genetics and traceability of spare parts
Each key component can trace sources, batches, life cycle and location
| Widget Category | Specifications / Model | Brand / Vendor | Serial number/ Batch | Source | Organisation | Installation Time | Life cycle state |
|---|---|---|---|---|---|---|---|
| Battery module | LFP module 280ah | CATL LF280K | CN-A1283KX1P7 | TIANCHU spare parts warehouse | Cluster-03 Rack-12 / Slot-04 | 2025-05-16 | Active |
| Fan Unit | CSC-300A | TIANCHU | CSC300A25040123 | TIANCHU spare parts warehouse | Cluster-03 Rack-12 | 2025-05-16 | Active |
| DC contactor | HVC-500A | TE Connectivity | TEHVC500A250102 | TIANCHU spare parts warehouse | Cluster-03 Rack-12 | 2025-05-16 | Active |
| Melting machine | DC 1500V 500A | Bussmann | 170M6616250331 | TIANCHU spare parts warehouse | Cluster-03 Rack-12 | 2025-05-16 | Active |
DMO Incident Rewinding (flow icon, non-actual performance)
Synchronising folder
A 100 MW/200 MWh power station is charged with a Cluster-03 local temperature rise anomaly and the system triggers a drop.
Scope of impact
Scope of impact1 Cluster-03
System Availability-8.7%
Disposal target
To locate the physical root causes and restore the system ' s rated capabilities to the extent that they are safe and manageable.
Critical period
Isolation and positioning6.2 Hours
Repair and Validation10.5 Hours
Restore networking1.3 Hours
Cumulative18.0 Hours
Fragmentation process
BMS Alert: Local warming
PCS parameters: DC side normal
Heat management: Wind abnormalities
Electrical: No apparent anomalies
Environment: Temperature normal
Location: Cluster-03/Rack-12
Local windways blocked.
Local windways blocked.
• Dismantling, cleaning and replacing abnormal fan units
Validation pass: restoration of rated capacity
Restore Authentication Path (Excerpt)
Critical temperature change
Recharge power restored.
| Indicators | Before repair | After repair | Change |
|---|---|---|---|
| Local temperature difference | 6.8°C | 1.7°C | -75% |
| Cooling airflow | 62% | 96% | +34% |
| Available Power | 183.2 MW | 200.1 MW | +9.2% |
| System efficiency | 91.2% | 96.6% | +5.4% |
The problem is that the problem is being solved under control and evidence.
Make the system safe, stable and sustainable.
Engineering teams can provide support as contracted