Integrated lithium battery energy storage solutions
INTEGRATED BESS DELIVIRY - Integrated BESS Delivery Project

Delivery of a complete set of borders from system architecture to on-site inspection and inspection

Integrated design, multi-professional collaboration, plant validation, on-site integration, full-process closed loop.
DEMO PROJECT
01 Battery systems
02 Direct current / electricity distribution
03 PCS
04 Communication and distribution
05 Transformer
06 Middle pressurized switch station
07 Connect Point PCC
Control and Surveillance Faces (Blue) & nbsp; EMS BMS Communications
Power path (orange) · DC · AC · transformer · grid connection
Safety and assurance plane (green) · fire · thermal control · safety interlock · earthing

01 Complete Physical Scope Map Queue

Battery systems

  • Core / Model / Pack
  • Rak and battery cabinets
  • BMS System
  • DC protection

Direct current / electricity distribution

  • Direct flow.
  • Straightway breaker
  • Isolation and protection
  • DC measurement

PCS

  • Two-way transformer
  • Power control
  • And offline control.
  • Protection interface

Communication and distribution

  • AC remittance
  • Switches and Protection
  • Exchange measurement
  • Supplementary power supply

Transformer

  • step-up transformer
  • Temperature monitoring
  • Protective devices
  • Earth system

Middle press switch / PCC

  • Switches
  • Protection and measurement
  • Grid-connected interface
  • Schedule signal
EMS Energy Management
BMS Battery management
Communications network Station communications
FIRE FIGHTING SYSTEM Fire protection
Thermal management HVAC / liquid cooling
Monitoring platform Events and trends

02 Project main line Full Process

01
Definition of needs DPP
02
Solution design System Freeze
03
Procurement and manufacturing Cross-discipline coordination
04
System FAT Plant integration
05
Logistics and transport Project shipment
06
Site installation Construction integration
07
Electronized. Commissioning
08
SAT / performance acceptance Live witness.
09
Handover. Handover

03 Multi-professional interface and control view Duties . Interface . Status . Conflict closed loop

Control and monitoring
Power links.
Safety interlock
Communications network
Organisation Main Interface Key ICD Interface content Current Status Conflict closes
Battery systems Batteries / BMS Management INT-BAT-01 DC/ Current / SOC Completed None
PCS Energy Conversion and Control INT-PCS-01 Power / Status / Fault Completed None
EMS Run policy and schedule INT-EMS-01 Run Target / Status Completed None
AC/DC electricity distribution Electricity distribution and protection INT-PWR-01 Switch / Protect Completed None
FIRE FIGHTING SYSTEM Fire and chain INT-FIR-01 Alarm / interlock Completed None
Thermal control system Thermal management INT-HVAC-01 Temperature/ Flow Completed None
MV Connect Network protection and measurement INT-MV-01 PCC Status / Electrical Quality Completed None
Total ICD 58
Completed 58
Pending conflicts 0
Closed Conflict 0

04 Design deliverables Charts and Matrixs

General plane layout (GA)

One System Chart (SLD)

Communications polo

Safety interlock matrix (excerpt)

Close the scene. Trigger condition Execute Action Associated System Priority
Battery height T > 55°C Power limit / stop BMS–PCS High
Fire alarm. Smoke/ Temperature Stop and isolate Fire - BMS High
Insulation failure. Riso's abnormal. No charge. BMS–PCS High
The grid is abnormal. Voltage / Frequency Excess PCS protection PCS–MV High
Liquid-cooling fault Flow / Temperature Abnormal Run down HVAC–PCS Medium

05 Plant System Establishment and Authentication FAT

System Integration Complete system assembly, control and status verification.
Hardware and communications checks Backway checks, communication links and interface consistency.
Protect & Chain Authentication Protection setpoints, fault handling, and safety interlocks.
Function and Policy Validation Charge, dispatch, and offline and system policy.
FAT Review and Witness Test results witnessed, issues closed and reports signed.

06 Site construction and installation

Basic and civil construction
Equipment in position.
Cable setup
Liquid-cooling pipe installation
Place and level
Fire system installation
Networking

07 On-site receiving and inspection chain From electricity to performance.

01

Completeness of information

  • Document version
  • Security clearance
  • Device Deck
  • System configuration
02

No power confirmation.

  • Electrical system
  • Support systems
  • FIRE FIGHTING SYSTEM
  • Mechanical inspection
03

System connectivity

  • PCS networking
  • EMS dispatch
  • BMS Connection
  • Reports and incidents
04

Networking performance

  • Power Response
  • Yes / No
  • Electrical Quality
  • PCC Control
05

Safety and isolation

  • Fire fighting.
  • Clear.
  • Protect Actions
  • Failure recovery.
06

Performance acceptance (SAT)

  • Capacity Test
  • Efficiency test
  • Response Time
  • Run continuously

08 Question and recalibration Punch List Management

Question ID Discovery phase Problem description Impact Responsible party Corrective measures Repeated results Evidence Status
ISS-2024-017 Installation phase Battery module has a disproportionately high resistance to ground connection. Medium Construction Reprocessing location Qualified Photo / Report Closed
ISS-2024-028 Debug phase The temperature-controlled communication doll dropped the package. Low Vendors Replacement of communications module Qualified Test Record Closed
ISS-2024-041 Convergence phase EMS TimeSync Offset Low Integrated Formula NTP Configuration Optimization Qualified Log Data Closed
ISS-2024-056 SAT phase The PCS has no response limit. Medium Vendors Parameter Optimizing and Retrying Qualified Test Curve Closed
Total number of questions 56, closed 56 (100 per cent) and there were no outstanding issues.

09 Representative Integration BESS Project DEMO

Project summary

Project size 100MW / 200MWh
Battery systems LFP 3.2V / 314Ah
PCS Configuration 8 sets of PCS
Communication side 0.69kV / 35kV
Connect Point 35kV Access PCC

Scope and responsibility

  • System design and engineering integration
  • Equipment manufacturing and plant certification FAT
  • Field installation and debugging
  • Web-enabled acceptance SAT
  • Document and Training Transfer

Project Status

✓ Design complete.
✓ Delivery of equipment completed
✓ Field debugging complete.
✓ Performance clearance.
✓ Transferred to Transport

Key performance results (SAT)

Available capacity ≥ 200.0 MWh
Station efficiency 89.6%
It's time to respond. ≤ 200 ms
No functional response time ≤ 200 ms
Run continuously 72 h No anomalies

10 Technological and transport support

DOC
Design and Documentation Design documents, completed information and configuration baseline
TOOL
Construction tools Specialized tools and field testing resources
DATA
Test Data FAT, SAT and performance test records
SYS
System & Debug EMS/BMS/PCS configuration and field parameters
TRN
Training Transport, Security Trading and Emergency Exercise
SP
Spare parts for spare parts Guidance on spare parts strategy, inventory and replacement
SUP
Remote and On-site Remote Support works with field service
QA
Quality assurance and services Quality assurance coverage, response and problem closed
OPS
Project package Run data, events, trends and delivery archiving
Delivery principles: Ensure that the scope is clear, interfaces closed and performance validated, and that the system is stable and efficient in the long term.

11   Next Discussion of integrated BESS delivery boundary

We work with you to define needs, define borders and optimize programmes to ensure successful delivery.