Integrated lithium battery energy storage solutions
REPORTS & DATA EXPORT | Report & Data Export

Bring operating evidence into the right reports and systems under the correct definitions

Real-time data, operational events and proof of overhaul linking large power storage plants, with clear ranges, uniform calibration and controlled distribution processes, generate reports and data deliverables for operations, assets, projects, technology and Systems Information.

Large BESS power station & operating source
Capacity 200 MWh
PCS 40 × 2.5 MW
Batteries 80
Station 1
EMS
PCS
BMS
Measurement
Alarm
Manual records
Report assembly and governance area
Operation Monthly Report 2024-05 Technical review

Key indicators

Trends analysis

Event statistics

Structure distribution

Energy indicators 2024-05-31 23:59 ✓
Availability of equipment 2024-05-31 23:59 ✓
Battery health data 2024-05-31 23:59 ✓
Summary of inspection work orders 2024-05-31 23:59 ✓
Delivery to interested parties
OPS
Power station operator Run the daily paper, KPI, all-site evidence
O&M
Working Group on Transport • Examination of evidence
OWN
Asset owner Performance assessment
API
Systems Integration File and API Data Delivery
Reporting cycle 2024-05-01 – 2024-05-31 Time zone: Asia/Shanghai (UTC+8)
Asset scope Sky Chain Power Plant 200 MW / 40 PCS
Calculator engine and calibration version CALC-2024-05-01 v1.2.0 Entry into force: 2024-05-01
Data integrity 99.32% Threshold 98%
Organisation Prepare for release. Expected issuance: 2024-06-0210

01 Reporting system and upstream data sources

OPS Operational report EMS / SCADA, metering table, weather station
PERF Performance and efficiency report EMS / SCADA, PCS, meter
ALM Alerts and incident reports Alarm system, BMS, and event work orders
BAT Battery health report BMS, Core and Rack Data
O&M Maintenance and service reports Worksheet system, spare parts warehouse, manual records
PRJ Evidence of project and compliance Configuration library, test report, document library

02 Range and caliber builders Scope Builder

Asset boundary
Popup
Time frame 2024-05-01 00:00:00 → 2024-05-31 23:59:59
Organisation Asia/Shanghai (UTC+8)
Run Filter
Data quality thresholds Fullness 98% | Single point break 15 min
Unit agreement Energy MWh | Power MW | Temperature °C | SOC %
Calculating calculator Version CALC-2024-05-01 v1.2.0
Current scope of reporting: Sky Chain Energy Plant (200 MW),Use TOPO-2024-05-01 v3.1, Filter Networking.

03 Report assembly flow lines Process of generation of individual report packages

01

Raw data ingestion

  • EMS / SCADA RAW
  • BMS RAW
  • Meter RAW
  • Sheet / Event Record
02

Time Alignment / Quality Rules

  • 15 min time film
  • Missing detection
  • Abnormal value recognition
  • Quality Identification
03

Calculator Engine

  • CALC-2024-05-01
  • v1.2.0
  • KPI Calculator
  • Validation of caliber consistency
04

Evidence formulation/ assembly

  • Trends
  • Takuboshot
  • Organisation
05

Technical review

  • Engineer review
  • Calculate Verification
  • Coherence check
  • Question amendment
06

Controlled release

  • Approved version
  • Publication of records
  • Watermark
  • Signature
07

Delivery channel

  • PDF Report
  • Data Files
  • API
  • Project package
Current Report Package Operation Monthly Report 2024-05
Package ID RP-OP-2024-05-01
Current stage: Technical review
Estimated release time 2024-06-02 10:00

04 Regular reporting and audience/access governance

Report Frequency Trigger Role Scope Delivery modalities Reservations
Operating daily newspapers 08:30 Daily Run a duty group Operation Station Mail/ System 7 days
Businessweek 09:00 a week Operations Engineer Operation Station Mail/ System 30 days
Operation of monthly reports 10 a.m. monthly Asset owner Management Station Mail/ System 90 days
Quarterly Performance Report Quarterly Integrator Item Station Mail/ System 180 days
Annual compliance report Year Regulation / Compliance Compliance Full life cycle System / API 365 days
SSO / RBAC Identity and role decision visits
Download Control As mandated by role
Watermark/ Audit Download and share marks

05 High frequency-by-frequency reports Sync Time axis

06 Data Export and Large Data Volume Tasks CSV / Parquet / API/ Batg Export

Task ID EXP-2024-05-0007
Data Set Site run data (15min)
Output Format Parquet
Time frame 2024-05-01 → 2024-05-31
Filter Conditions All Assets/ Networking
Compression ZSTD
Verification SHA256
Projected data 78.6 GB
Particle / Partition 15 min / By day
Field Dictionary FIELD-DIC-2024-05 v1.0
Retain Policy Reservations 180 days
Created 2024-05-31 18:20

07 Statements / Audit / Audit Tracking Reporting throughout the life cycle

Version Status caliber version Modify Summary Generation time Generator Approving authority Release time Watermark Operation
v0.1 Draft CALC-2024-05-01 v1.1.0 Initial Generation 2024-05-28 10:12 Engineer A — — DRAFT Details
v0.2 Reviewed CALC-2024-05-01 v1.2.0 Fix Missing, Chart Update 2024-05-30 19:44 Engineer B Senior Engineer C — REVIEW Details
v1.0 Published CALC-2024-05-01 v1.2.0 Officially issued 2024-06-02 10:00 Engineer B Senior Engineer C 2024-06-02 10:02 RELEASED Details
v0.9 Cancelled CALC-2024-05-01 v1.1.0 Alteration of calibre resulting in substitution 2024-05-29 11:20 Engineer A — — SUPERSEDED Details
RELEASED
v0.1: Original generated version, only for internal verification and not for public release.

08 Controlled changes and re-issues Cases of change of calibre

2024-05-29
Problem finding. A partial measurement of calibration was found to be inconsistent with the latest version of the operational rules.
2024-05-30
Impact assessment Impact energy, efficiency and some monthly reporting indicators.
2024-05-31
Alarm Update CALC-2024-05-01 v1.2.0 Entry into force.
2024-06-02
Reissued Reports and data kits were reissued to original mandated audiences.
History Version
Original version processing v0.9 Marked as Supersed, but maintains a full history.

09 Project package and delivery archive

Project delivery content

Index of reports Directory and metadata
Original Data Set Raw Data List
Processing data Alignment and Purge Results
Field Dictionary FIELD-DIC-2024-05 v1.0
Evidence of events Alert / Worksheet / Live Record
Maintain history Worksheets, inspection, review of records
Configuration baseline Pop, Parameter, Solid Version
Publication of lists Report, data export, version and validation summary

10 Border description

ANA

Analysis and validation done on professional analysis pages

This page does not redefine professional algorithms such as SOC, efficiency, performance, health, etc., but refers only to the results of the modulated analysis and computational evidence.

RPT

Report & Data Export = Delivery Layer

This page covers asset range, calibre, evidence assembly, release governance, document/API export and reporting life cycle.

DOC

Technical documents are centrally managed by the Document Centre

Product manuals, interface documents, design documents, programmes and long-term engineering documents, with the official version of governance performed by the Documentation Centre.

11 Output List This page generates and delivers controlled results

TPL Reporting template .rpttpl
META Definition of scope .json
MAN Data Export List .yaml
PDF Report pack published .pdf
DATA Data Export Package .parquet
API API Task Record .json
AUD Approval and audit log .log
ZIP Project Delivery Archive Package .zip
Ultimate Principle: Each report and data delivery must be able to return Data Source → Scope → Calculation Version → Evidence → Review → Release Version , thereby ensuring that reports can be validated, retroactive, reissued and support project audits over time.