From one site to the entire portfolio,
Keep Unified Run View
Station and site management organizes areas, sites, Blocks, cabinets, subsystems and equipment into the same set of asset classes so that operational status, anomalies, configuration versions, tasks and performance can be traced back from the assembly level to the equipment level.
01 Summary of asset hierarchy and registration Harmonization of asset identity from area to equipment
Region
Station
Block Block
Box / Rack
Subsystem
02 Station contrast board Comparison of performance across regions
Jiangsu. Station Running
Guangdong Foshan Park Station Maintenance
Inner Mongolia Ulanchab power grid side station Running
03 Regional Operational Profile
04 Unusual event depth drilling We drilled all the way from the group level to the device and the subsystem.
Summary of events
Trends in key indicators
05 Site base Harmonized comparison of availability, efficiency, temperature control and power response
| Station | Availability | Energy density | Charge Efficiency | Heat management level | Power Response | Alarm density |
|---|---|---|---|---|---|---|
| Jiangsu Salt City Lighthouse Station | 98.76% | 2,145 | 91.32% | 28.6 | 1.45 | 0.32 |
| Guangdong Foshan Park Station | 95.23% | 1,678 | 89.11% | 31.4 | 1.92 | 0.81 |
| Inner Mongolia Ulanchab Station | 97.88% | 2,312 | 92.07% | 26.8 | 1.36 | 0.28 |
| Zhejiang Lakezhou Station | 97.29% | 2,045 | 90.83% | 28.9 | 1.58 | 0.47 |
06 Station task force line Harmonization of inspection, inspection and configuration tasks
| Task Type | Task Title | Location | Planned time | Status | Head | Collaborators | Progress |
|---|---|---|---|---|---|---|---|
| Inspection | Monthly equipment inspections | Jiangsu Salt Station | 05-25 → 05-25 | Ongoing | Zhang | Maintenance team |
|
| Preventive Maintenance | PCS filters and dissipation | Fushan Station, Guangdong | 05-24 → 05-24 | Ongoing | Li Xiao. | Vendors |
|
| Configuration Check | Battery policy parameters verification | Inner Mongolia Station | 05-27 → 05-28 | Approved | Wang Man. | System Team |
|
| Change management | BMS software parameter optimization | Fushan Station, Guangdong | 05-26 → 05-26 | Under approval | Zhao | Transport team |
|
07 Configuration and baseline management
08 Online process on site Standardized registration, verification and shipping
09 Station operations report One key to create management, anomalies, performance and maintenance view
Station operations report Reporting period: 2025-05-01 – 2025-05-23
Regional size
Unusual events
Asset completeness
Responsibility and restructuring
10 Boundaries and coordination Site view connects the asset platform, configuration governance and transportation processes
Asset management
Maintain unique asset identity and hierarchy across regions, sites, blocks, cabinets, subsystems, and devices.
- Asset ID and life cycle
- Levels and sprawl.
- Device Master Data
Configuration governance
Manage software, firmware, parameter, and protocol baselines; assess change impact and release in controlled batches.
- Version baseline
- Compatibility check
- Change and Roll Back
Transport process
The anomaly, inspection, maintenance and rehabilitation tasks are linked to the counterpart assets and those responsible.
- Worksheets and SLA
- Allocation of responsibilities
- Close & Operation Duplicate