Integrated lithium battery energy storage solutions
ENERGY MANAGEMENT PLATFORM

From operating targets to device commands,
form a verifiable energy-management closed loop

Station-level EMS unifies load, PV, grid requirements, equipment availability, and storage boundaries in one operating framework—from day-ahead planning and intra-day adjustment through PCS, BMS, and field execution—then confirms every command landed via measurement feedback.

The optimizer determines how " it wishes to run " and EMS is responsible for converting it to a secure, defined, enforceable and verifiable device action.
PV Optical Array PV 18.6 MW
TR step-up transformer Transformer 33 / 110 kV
BESS Energy Storage Systems BESS · SOC 62.4%
PCS PCS Conversion System Two-way power control
MAIN Main transformer Transformer 110 kV
GRID Grid Connection Status Grid 110 kV
Current mode of operation Peak Reduction Policy: PAAK SHAVING
Site Load 42.7 MW Real time measurements
The light works. 18.6 MW Act in real time.
Storage Power -16.2 MW Power discharge.
SOC 62.4% System average
Available backup 8.6 MW Organisation
Network power -24.3 MW Negative: Sending electricity to the grid
Network frequency 50.01 Hz &Normal

01 First define the running target, then decide how the storage can move.

PEAK
Peak Reduction Reduce site peak and limit maximum demand
PV
Optical self-maximum Improved local use of new energy sources
DEM
Demand management Control of contract requirements and grid-connected power
RES
Standby capacity Guaranteed reconciliation capacity and recovery residuals
GRID
Grid Response Participate in FM/ dispatch/ support services
Peak reduction: Subject to SOC, equipment power, grid and reserve boundaries, station peak loads are limited to the set target.

02 Any movement must be subject to the equipment and station. Constraint to decide which plan is the plan to implement.

SOC
SOC Window Allowed energy range
20% – 90%
P
The PCS has power. Charge / discharge power boundary
-25 → +25 MW
Q
PCS incompetence Power factor / no power constraint
-25 → +25 Mvar
POI
Network power limit POI Double Power Boundary
-40 → +40 MW
T
Ambient temperature Thermal management and reduction basis
-10 → 45°C
HA
Availability of equipment Runable Unit Pool
≥ 96%
SOC window: Plan SOC remains within the controlled window and must set aside the upper and lower limits required for equipment protection and backup capacity.

03 · forecast → plan → dispatch → feedback → correct, forming a closed loop

A 24-hour scroll-axis: All inputs, plans, instructions and feedback use a uniform time frame.
Load forecast Photovolt prediction Time price of electricity Network power Storage Power Standby capacity target Schedule Command Actual feedback

04 Previous planned and daytime dispatch desk

Plan Generation
05-19 16:20
Ban the core.
05-19 16:28
Programme evaluation
05-19 16:35
Manual confirmation
05-19 16:40
Release Execution
05-19 16:42

05 Command link: certainty closed loops from EMS to executive level

EMS EMS dispatch Policy number
CMD-20250520-0132
PCS PCS Executive Level Power down.
Pset = -16.0 MW
BMS BMS Management SOC 62%
Temperature 31°C
Allow Run
BAT Battery systems Actual current
-412 A
MTR Site Measurement Actual Power
-16.1 MW
Principle of certainty: EMS's “request sent successfully” is not completed. The final state must be confirmed jointly by PCS response, BMS clearance, equipment action and independent measurement feedback.

06 Mode Switches to Priority Award

1
Security priority Equipment security, electricity grid security, fire protection and protection
2
Contract / grid constraint Networking restrictions, back-up and response commitments
3
Previous schedule Plan power and energy targets
4
Intra-day dispatch Real time correction and scheduling instructions
5
Local optimization of equipment SOC balanced, efficient, heat management
Run Mode Core objectives Typical conflict Storage action
Peak Reduction Lower Peak There's not enough backup. Controlled discharge
Photovoltaic. Increase in the rate SOC ceiling First Charge
Requirement Control Limit grid power Power capacity Peak / Hollow
Grid Response Tracking command Equipment protection Protection priority
Equipment constraints Protection equipment Economic objectives Decrease / Stop
Normal
Target Switch
Binding trigger
Policy Switch
Command Amendment
Restoration of stability

• Each power directive must leave reversible evidence of execution

Plans, commands, permissions, execution, and measurement results are linked by one Command ID.
Command ID CMD-240519-02
Planned date 2024-05-19
Time Resolution 15 min
Organisation UTC+8
Planned Status Published
CMD Command Version CMD-20250520-0132
PEAK_SHAVING_v3.2.1
PCS PCS Output Power Pset
-16.0 MW
BMS BMS Permission Status SOC / Temperature Allow
Allow Run
BAT Battery current Actual
-412 A
MTR Actual Power Measuring feedback
-16.1 MW

08 Strategic governance: from configuration to continuous optimization

01 Policy Configuration Targets, parameters, boundaries
02 Simulation Verification scene replay and border verification
03 Role clearance Multi-role assessment and delegation of authority
04 Controlled release Version effective and rollback point
05 Operations monitoring Continuous assessment of effects and deviations
06 Version History Strategy iterative and change retrospective

09 Border description

✓ Scope of this page: Site-level EMS operational objectives and strategy implementation
✓ Current / Day plan receipt and adjustment
✓ Real-time restraint management of equipment and sites
✓ Instructions issued, permission checks and execution closed loops
✓ Operational strategy and version governance
Station level EMS
Implementation and coordination level
Multi-target command and capability coordination
• Optimization and strategy platform
Run performance and deviation closed loop
• Performance analysis platform
× Not on this page: Market-level transaction optimization
× Not on this page: Transregional grid movement
× Not on this page: electrochip level protection control
× Not on this page: Long-term asset lifetime projections
× Direct control without bypassing PCS / BMS
Principles of responsibility: The Optimization and Strategy Platform is responsible for “calculating better targets”, the EMS is responsible for “translating targets into safe and implementable equipment behaviour”, the PCS/BMS is responsible for equipment-level control and protection, and the Performance Analysis Platform is responsible for validating the results of the plan.

10 Platform output

OBJ Run Target Model Peak, self-use, backup and grid target
CONS Constraint Equipment and site to enforce the boundary
DAY Previous schedule Plan 24 hours and SOC tracks.
ROLL Scrolling in the Day Real-time revision of projected changes
CMD Command / Event Record Full Command ID and implementation chain
EVD Evidence of execution Planning, command, measurement and deviation
KPI Operational policy report KPI, deviation and version impact assessment