Integrated lithium battery energy storage solutions

Customized documentation|OEM project document control

Keep equipment configuration, project revision and delivery files always aligned

Generate, review, control and deliver engineering packs from the system baseline — not a public download wall.

Project dashboard TC-DOC-26-022 Running Demo data
Product baseline
REV-C demo
Project baseline
PB-022
Required docs
86
Issued
61
In review
14
Pending
11
Languages
ZH / EN / ES
Next release
IFC-02
Access level
Role-gated

Four documentation capabilities

What OEM project document control must deliver Demo data

  • Document plan & scope MDRL by phase, audience and regulation
  • Config-linked source of truth Every file carries baseline IDs
  • Multilingual & brand fit Controlled translation · customer cover
  • Version control & controlled issue Approval · access · receipt trail

Document requirements matrix (MDRL) · digital product passport & tree

Requirements flow into the plan — passport binds cabinet metadata to eight controlled classes Demo data · TC-DOC-26-022

Requirements → critical factors → outputs → MDRL

SourceCritical factorOutputIn MDRL
Contract / awardScope languagesSystem spec setYes
Interface freezeICD completenessICD masterYes
Factory gateFAT evidenceTest / compliance packYes
Site SATAs-built fidelityInstall / As-Built packYes
O&M handoverRole accessO&M + issue logYes

Digital product passport

BESS cabinet for digital product passport (demo reuse)
Product
BESS cab demo
Serial range
SN demo set
Config
REV-C · PB-022
Owner pack
DPP-022-B

Eight-class document tree

  • Specification SPEC-*
  • Design drawings DWG-*
  • Interface / control ICD-*
  • Manufacturing internal MFG-INT-*
  • Test evidence TST-*
  • Compliance CMP-*
  • Install / commissioning INST-*
  • O&M OM-*

Change impact

Configuration change → related documents auto-tracked

Source event, affected docs with evidence status, and approval owners — demo Demo data · PCS FW baseline change

Change source

Event
PCS firmware baseline bump
From → To
FW-1.2 → FW-1.3 demo
Trigger
ECN-DOC-022-07

Affected docs & evidence

  • ICD PCS set Impacted Diff pending
  • FAT case pack Retest Case delta
  • O&M procedure Edit Rev draft
  • Labels / HMI Review Screenshot
  • As-Built note Hold Gate after SAT
  • Issue log Open Tracker

Approval & owners

  • Author Systems eng. demo
  • QA Doc control
  • Customer IFC reviewer
  • Impacted
  • Retest
  • Edit / Review
  • Hold / Open

Specs & drawings · interface control · manufacturing internal → customer pack

Four-lane flow — desensitize and sign before controlled external issue Demo data

Desensitize · sign-off · controlled issue

Product / system specs & drawings

  • System specification C RELEASED
  • GA drawings B RELEASED
  • Wiring diagrams B REVIEW

Interface & control docs

  • ICD master index C RELEASED
  • PCS / EMS ICD C RELEASED
  • Comm map B REVIEW

Manufacturing internal pack

  • Process sheets INT INTERNAL
  • In-process checks INT INTERNAL
  • Serial genealogy INT INTERNAL

Customer delivery pack

  • Controlled issue set IFC-02 ISSUED
  • Redacted MFG extracts A ISSUED
  • Receipt template TPL TEMPLATE

Controlled baselines

From design freeze to As-Built — every stage has a controlled baseline

Nine stages with baseline ID, status, date and note — demo Demo data

StageBaselineStatusDateNote
DF Design freezeDF-022CLOSED2026-03-01Config locked
PP Proto packPP-022CLOSED2026-03-18Internal review
PR Production readyPR-022CLOSED2026-04-02Release set
FAT / PSIFAT-022CLOSED2026-05-10Evidence attached
ShipSHP-022CLOSED2026-05-22Pack list
InstallINST-022IN PROG2026-06-05Site notes
SATSAT-022PLANNED—Gate after install
As-BuiltAB-022PLANNED—Rev match
O&M serviceOM-022TEMPLATE—Access roles
  • CLOSED
  • IN PROG
  • PLANNED / TEMPLATE

Test & compliance · install / O&M · multilingual brand · customer cover preview

Evidence tables plus language coverage and branded cover demo Demo data

Test & compliance evidence

ItemAudienceStatus
FAT report setCustomer QARELEASED
Certificate packAHJ / customerIN PROG
Type test indexEngineeringRELEASED

Install / commissioning / O&M

ItemAudienceStatus
Install manualSite crewREVIEW
Commissioning checklistFSERELEASED
O&M manualOwner opsREVIEW

Brand & multilingual production

  • ZH 100%
  • EN 100%
  • ES 86% demo
  • Master EN controlled
  • Parallel ZH signed
  • ES in translation QA

Customer brand preview

Customer-branded document cover preview (demo reuse)

Cover + header block with customer logo placement (demo)

Request & approval · controlled access · issue tracking

Three equal columns — who asks, who can see, what was issued Demo data · IFC-02

Request & approval

  • Spec
  • ICD
  • Manual
  • Evidence
DocFromToGate
ICD-PCSBCQA + cust.
OM-ZHABL10N + QA
FAT pack—Iss.FAT close

Controlled distribution & access

RoleViewDownloadApprove
AuthorYesYesSubmit
QAYesYesSign
Customer IFCYesControlledAccept
Site crewSubsetNo—

Issue & delivery tracking

IssueRecipientAck
IFC-02 packEPC leadACK
OM subsetSite PMACK
FAT evidenceQAPENDING

Digital delivery pack (DPP) integrity · quality completeness dashboard

Package tree with checksums — and a scored completeness board Demo data · DPP-022-B

DPP integrity

Package ID
DPP-022-B
Files
127 controlled
SHA-256
Manifest locked
Publish
VDR gated
  • 00_Index
  • 01_Specs
  • 02_Drawings
  • 03_ICD
  • 04_Test_Compliance
  • 05_Install_AsBuilt
  • 06_OM
  • 99_Issue_Log
  • Manifest complete
  • Checksum match
  • Watermark policy
  • Access roles mapped

Quality & completeness

98% Completeness score (demo)
  • Required vs issued 61 / 86
  • In review 14
  • Open findings 3
  • Overdue 1

Finding tracker

IDDocSeverityState
F-01OM-ESMedOpen
F-02DWG wireLowWatch
F-03Cert addendumHighIn fix

Delivery outcomes overview (updated with the project)

Nine artifacts that close the controlled documentation pack — not a public knowledge-base entry Demo data

  1. MDRL Requirements plan
  2. Controlled specs Rev-locked
  3. Drawing set GA / wiring
  4. ICD / control Interface master
  5. BOM / config Baseline IDs
  6. O&M manuals Brand / L10N
  7. Test / compliance Evidence pack
  8. Install / As-Built Site fidelity
  9. Issue & receipt log IFC trail