Integrated lithium battery energy storage solutions
CHARGE & DISCHARGE TESTING

Let every megawatt of power and every
megawatt-hour of energy be verified against real operating curves

Under a 10–90% SOC window and 1.25 MW operating condition, verify capacity, efficiency, power response, rack consistency, thermal state, and time synchronization—and bind all results to one metering boundary and test-evidence chain.

Performance is not a nameplate number—it is a repeatable, reconcilable, and traceable closed-loop test.

Energy path and measurement boundary

Regenerative Loader 1.5MW
Grid Emulator
AC side total measurement TC-ACM-01
0.25
PCS 1.25MW
Power Conversion
Total measure on the DC side TC-DPM-01
DC Boundary
DC collection cabinet TC-DCC-01
Current / Voltage
15 Racks 5.064MWh
Battery Boundary
Time sync: PTP / IEEE 1588, the measurement chain time difference requires & lt; 1 ms; AC side, DC side, Battery side and Auxiliary energy consumption must use the same time frame to perform the energy reconciliation.

Full circulation power and SOC time axis

How do 15 Racks keep up?

Rack current

Rack current consistency. ≤0.8%

Rack SOC Condense

Maximum deviation 0.8%

Single-body voltage Dispersion

Max. 27 mV

Thermal response and cooling costs

Rack average temperature
30.9°C
Peak
34.6°C
Temperature zone
27.2°C

Efficiency and available energy books Within metering boundaries

Energy Path

AC Charge Input 4.35 MWh
DC Battery Charge 4.18 MWh
Delivery of DC energy 4.07 MWh
Delivery of AC energy 4.04 MWh
PCS losses 0.10
Battery damage 0.11
Wire/switch 0.01
Cooling auxiliary. 0.083

Dynamic and Power Responsive

Step Response (Target ± 1.25 MW)

90% Response: 620 ms

Power constraints and sustainability

±1.25 MW for continuous operation & lt; 0.6%

Three-cycle repetition and receiving window

Three complete cycles SOC/ Power Overlay

Available Energy (DC)

Mean 4.07 MWh
Repeatability ±0.42%
Maximum deviation 0.04 MWh

Receiving window and determination

Item Request Result Decision
Continuous Power ±1.25MW 1.25MW PASS
DC Energy ≥4.06MWh 4.07MWh PASS
Rack SOC Consistency ≤1.0% 0.8% PASS
Max. ≤30mV 27mV PASS
AC Efficiency ≥90% 92.9% PASS
DC Efficiency ≥95% 97.4% PASS

Performance evidence kit

PLAN Test plan Charge / Discharge Plan
CURRENT
CAL Certificate of metering equipment Calibration
VALID
SYNC Sync and Time Verify PTP Evidence
PASS
ACDC AC/DC Energy Book Energy Ledger
PASS
RACK Rack Consistency 15 Rack Comparison
PASS
IR Thermal imaging and temperature Thermal Evidence
PASS
NCR Abnormal treatment NCR-2608-0086
CLOSED
PDF Test report Signed Report
APPROVED

Release to aging & functional verification The performance cycle is closed.

Standards and internal norms Performance test background

IEC IEC 62933 Series Electricity energy storage systems performance, safety and system-level testing background.
IEC IEC 62619 / IEC 63056 Important input of Battery System security boundaries and test conditions.
GB GB/T 36276 Power storage enables lithium batteries to perform and safety requirements in the background.
UL UL 9540 System-level energy storage products are safe and integrated border reference.
Measurement principles: All capacity, energy, efficiency and dynamic response conclusions must clearly measure boundaries, equipment calibration status, time synchronization status and valid data windows; any marked INVALID FOR ACCEPTANCE Data should not enter formal performance conclusions.