0–2h
AGING TESTING
Apply time pressure early,
Let potential problems arise before delivery
Through 72 hours of controlled cycling and electric immersion, continuous observation of voltage, electrical resistance, SOC, temperature, communication and intermittent failure, capture systems are likely to fail and drift early in stable operation.
Production ageing belongs to Early-Life Screening, instead of 72 hours of full-life validation.
0h
24h
38h
48h
56h
72h
72 hours old formulation 15 seconds of routine record.
6h
6h
6h
6h
6h
6h
38–44h
44–48h
48–56h
56–72h
Pre-treatment and inspection:
The power check, the insulation check, the communication confirmation, the BMS state and the cooling system confirm that the system meets the aging start conditions before it enters the cycle.
Security clearance activated.
Interlock Ready
Automatic protection and reduction
Insulation Decline / Overtemperature / Overpressure / Communications Abnormal Auto Protection
Auto-stop boundary
Safety Boundary
Fifteen Rack Drifting Scan 72h Trend Overview
OCV drift (ΔmV)
Max. Rak SOC drift
0.9%
DCIR change (Δ)
Maximum temperature drift
0.4°C
SOC drift (%)
Increase in systems DCIR
1.8%
Temperature drift (Δ°C)
DCIR Limit
≤3%
Max. SOC drift
0.9%
Maximum temperature drift
0.4°C
System DCIR increment
1.8%
Conclusions
Steady trend
Intermediate Incident Observatory 72h Event timeline
0h
12h
24h
36h
48h
60h
72h
Controller Reset
Packet Drop
Sensor Excursion
Protection Event
Thermal Event
Operator Note
Rack 12 NTC Open
Controlled exception: Breaking between the Rack 12 NTC temperature channel (closed)
Event Window
NTC Open capture near about 12h
Impact isolation
Locks the 12-related temperature channel of the Rack
Corrective measures
Check the connection and sensor lines.
24h observation
Run on, no triggers again
NCR
TC-DEMO-NCR-2608-0091
CLOSED
Thermal Stability Observatory 72h Thermal static / Thermal leaching
Maximum Temperature
35.2°C
Maximum Rack Temperature
3.9°C
Cool the response.
< 8 min
Thermal stability
No Sustained Hotspots
Health comparison after ageing Around 72h
72h PRODUCTION AGING / EARLY-LIFE SCREENING — NOT SERVICE-LIFE QUALIFICATION
| Indicators | Before you get old. | After aging, | Change | Limit / Trends |
|---|---|---|---|---|
| Available Energy | 5,064.0 kWh | 5,028.1 kWh | -0.7% | ≥95% |
| Charge Efficiency | 99.0% | 99.3% | +0.3% | ≥95% |
| System DCIR | 1.342 | 1.366 | +1.8% | ≤3% |
| SOC drift | — | 0.9% | — | ≤2% |
| Rack's maximum temperature difference | — | 0.4°C | — | ≤1.0°C |
| Communication usability | — | 99.998% | — | ≥99.9% |
| Critical protection error triggers | 0 | 0 | 0 | Target 0 |
Early failure and detection The evidence is closed.
Event detection and isolation
Rack 12 NTC intermittent road was captured and isolated.Root Observation
Check the wiring status of connectors, terminals and sensors.Correcting and strengthening
Completion of the check-up, re-fixing and necessary corrections.Targeted monitoring 24h
0 Recurring
Contrast Authentication
Trends are normal
Grounds for release
0 Recurring
Trends are normal
No new proliferation
Allow the next stage.
Trends are normal
No new proliferation
Allow the next stage.
Aging evidence files Complete storage .
RCP
Ageing formulations and plans
ATP / Recipe / Batch
CUR
Trend curves
OCV / DCIR / SOC
1S
1 second trend data
Process Trend
100
100 ms capture event
Fast Capture
IR
Hot pictures.
Thermal Evidence
HLT
Health comparison
Health Comparison
NCR
NCR and unusual records
Exception Closure
REL
Repeat and Release
Retest / Release
Release to follow-up functionality and FAT phase End of the ageing phase
Standard and normative basis Production ageing phase
Engineering boundary:
This page describes the Early-Life Screening at the production stage. 72 hours of ageing for the detection of early failure, drift and assembly/connection problems should not be interpreted as full life, long-term durability or full life-cycle qualification.